Aug 25, 2026
Closes
Sep 7, 2026
Description: Project consists of development, and construction for the delivery of a new sanitary sewer under a build-operate-transfer structure pursuant to Indiana Code 5-23.
City · IN, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Brazil.
Adjacent opportunities open for bidding right now.
Aug 25, 2026
Closes
Sep 7, 2026
Seeking proposals from qualified consultants to install and maintain flow-monitoring equipment in three (3) sanitary sewer basins over a six (6) week wet weather-monitoring period until the 1" rain event occurs and to analyze and evaluate the flow data.
CityNC
Aug 17, 2026
Closes
Sep 17, 2026
Install approx. 12,571 LF 8", 10", 12" and 18" of CIPP installation (UV cure), 36 sanitary sewer manholes to locate, uncover, and raise to grade, 10 point repairs, and 13,615 LF of CCTV inspection.
CityWI
Sep 2, 2026
Closes
Sep 10, 2026
The Village of Hales Corners is soliciting bids for a one-lump-sum construction contract to install a natural gas generator at the existing Whitnall Way Lift Station, including site work, erosion control, mechanical and electrical work, bypass pumping, instrumentation and control, painting, concrete, restoration, cleanup, and startup. Alternate One covers replacing the Whitnall Way electrical panel, while Alternate Two covers modifying the pump control panel and related electrical work at the Garden Court Lift Station. This is a construction procurement rather than a grant, and the posting states that the online bid portal and electronic bid form open beginning September 2, 2026, with electronic bids accepted until Thursday, September 10, 2026, at 10:00 AM CDT.
CityWI
Sep 2, 2026
Closes
Sep 10, 2026
The Village of Hales Corners is soliciting bids for a one-lump-sum construction contract to install a natural gas generator at the existing Whitnall Way Lift Station, including site work, erosion control, mechanical and electrical work, bypass pumping, instrumentation and control, painting, concrete, restoration, cleanup, and startup. Alternate One covers replacing the Whitnall Way electrical panel, while Alternate Two covers modifying the pump control panel and related electrical work at the Garden Court Lift Station. This is a construction procurement rather than a grant, and the posting states that the online bid portal and electronic bid form open beginning September 2, 2026, with electronic bids accepted until Thursday, September 10, 2026, at 10:00 AM CDT.