Special DistrictWA
Aug 7, 2026
Closes
Sep 3, 2026
Diesel Generator Installation and Switch Gear Replacement RFP
Remove and dispose of old generator, remove fencing, pour new concrete pad, underground piping and trenching, install 400 Amp transfer switch for Annex (2913 Bldg.), replace switch gear in Main Bldg. (2911 Bldg.), Install new 180kw generator, build and install generator load test cabinet, test system. Ensure the 911 center does not loose power during the entire construction and testing phase.