Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services for windows, doors, HVAC, building controls, and front facade repair for the Leroy R. Coles, Jr. Branch Library.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide windows and doors, HVAC and building controls, front facade repair project.
Posted Date
Dec 19, 2025
Due Date
Jan 14, 2026
Release: Dec 19, 2025
Close: Jan 14, 2026
Provide windows and doors, HVAC and building controls, front facade repair project.
AvailableSeeking qualified firms or consultants to conduct a comprehensive fire station building condition assessment and station location study. Evaluate the six fire stations for: condition assessment narrative; structural integrity and building envelope condition; hvac, plumbing, electrical, and mechanical systems; code and ada compliance; service life and sustainability; deferred maintenance and life cycle costs; space utilization, ergonomics, and operational functionality; service life of operational equipment (doors, windows, paint, sidewalks, concrete, brick work, retaining walls, etc. ); assessment of maintenance approach compared to new construction estimates. See outside link.
Posted Date
Dec 1, 2025
Due Date
Feb 5, 2026
Release: Dec 1, 2025
Close: Feb 5, 2026
Seeking qualified firms or consultants to conduct a comprehensive fire station building condition assessment and station location study. Evaluate the six fire stations for: condition assessment narrative; structural integrity and building envelope condition; hvac, plumbing, electrical, and mechanical systems; code and ada compliance; service life and sustainability; deferred maintenance and life cycle costs; space utilization, ergonomics, and operational functionality; service life of operational equipment (doors, windows, paint, sidewalks, concrete, brick work, retaining walls, etc. ); assessment of maintenance approach compared to new construction estimates. See outside link.
AvailableConstruction may include, but is not limited to the following: General construction management, supervision, scheduling, coordination, and quality control of all construction activities; Civil, site, and utility construction, including earthwork, grading, paving, drainage, and underground utilities; Structural construction, including concrete, masonry, steel erection, and building foundations; Architectural construction work, including building envelope, roofing, interior build-out, finishes, doors, windows, and related assemblies; Mechanical, electrical, and plumbing (MEP) construction, including HVAC systems, electrical distribution, lighting, plumbing systems, and associated controls. See attached file.
Posted Date
Dec 22, 2025
Due Date
Feb 17, 2026
Release: Dec 22, 2025
Close: Feb 17, 2026
Construction may include, but is not limited to the following: General construction management, supervision, scheduling, coordination, and quality control of all construction activities; Civil, site, and utility construction, including earthwork, grading, paving, drainage, and underground utilities; Structural construction, including concrete, masonry, steel erection, and building foundations; Architectural construction work, including building envelope, roofing, interior build-out, finishes, doors, windows, and related assemblies; Mechanical, electrical, and plumbing (MEP) construction, including HVAC systems, electrical distribution, lighting, plumbing systems, and associated controls. See attached file.
AvailableThe project consists of partial demolition of existing structures and construction of a new, one-story office building approx. 3000 SF in size. The work includes but is not limited to mobilization, stormwater pollution protection, sheeting, shoring and bracing, sewer and stormwater connections, hazardous materials abatement, new fire barrier wall construction, fire sprinkler demolition, earthwork, concrete, framing, insulation, siding, roofing, doors, windows, hardware, HVAC, electrical, plumbing, low voltage IT and access control, fiber optic, solar photovoltaic and battery storage system, sitework, landscape, fencing, and asphalt slurry seal.
Posted Date
Oct 2, 2025
Due Date
Feb 26, 2026
Release: Oct 2, 2025
Close: Feb 26, 2026
The project consists of partial demolition of existing structures and construction of a new, one-story office building approx. 3000 SF in size. The work includes but is not limited to mobilization, stormwater pollution protection, sheeting, shoring and bracing, sewer and stormwater connections, hazardous materials abatement, new fire barrier wall construction, fire sprinkler demolition, earthwork, concrete, framing, insulation, siding, roofing, doors, windows, hardware, HVAC, electrical, plumbing, low voltage IT and access control, fiber optic, solar photovoltaic and battery storage system, sitework, landscape, fencing, and asphalt slurry seal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →