Missouri Office of Administration
State AgencyMO
Posted
-
Sep 10, 2026
Replace HVAC & Boilers/Pumps/Controls - Troop B Headquarters & Crime Lab
Work includes the demolition of the existing HVAC systems. A new HVAC system will be installed including a new air cooled chiller, new boilers, new pumps, new hydronic chilled and heating water piping, new VAV boxes, new indoor and outdoor air handling units, and new energy recovery units. The existing johnson controls system will be removed and replaced with a new johnson controls DDC system. Associated electrical work to power the new equipment is included.