Howard County Public School System
School DistrictMD
Posted
Oct 28, 2026
Dec 3, 2026
Harper's Choice Middle School Chiller & Cooling Tower Replacement RFP
Harper's choice middle school chiller & cooling tower replacement.
Description: Replacement of the cooling tower at Ledford Middle School; bids are for a single-prime mechanical contractor.
SchoolDistrict · NC, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
The minutes record Chris Johnston's review of the 2025-2030 CIP, which identifies HVAC and boiler replacements among district capital needs and prioritizes HVAC and roof repairs.
## Chris Johnston, Executive Director of Operations Mr. Johnston introduced representatives from the Operations Research and Education Laboratory of the Institute for Transportation Research and Education. Mr. Thomas Dudley and Mr. Brian Godfrey presented an overview of the 2024 Land Use Study Report detailing the current residential, commercial, and…
Davidson County Board of Education Open Session Meeting
Board meeting · Feb 18, 2025
Agenda packet
The agenda proposed review of a facility-needs survey listing full-campus HVAC renovations of $249,521,000.
TOPIC: FACILITY NEEDS REPORT DESCRIPTION AND ANALYSIS: Executive Director of Operations Chris Johnston will introduce a representative of Performance Services who will provide the Board with an executive summary of the North Carolina Department of Public Instruction Facility Needs Survey for Davidson County Schools. SUPERINTENDENT'S RECOMMENDATION: Board…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (19 days left)
Davidson County Board Of Education Meeting Agenda
Agenda packet · Aug 3, 2026
Adjacent opportunities open for bidding right now.
Howard County Public School System
School DistrictMD
Posted
Oct 28, 2026
Dec 3, 2026
Harper's choice middle school chiller & cooling tower replacement.
School DistrictNE
Posted
Oct 26, 2026
Dec 1, 2026
Demolition, removal, proper disposal and replacement of one existing cooling tower at Marrs MS. The existing cooling tower is a 500 Ton single cell cooling tower located on a 4-pier support system roughly 10' above grade. New tower is to be installed directly on existing structural supports. The work also includes adding a 6" strainer at each heat exchanger and modifying the sump tank pipe inlet for better flow conditions. See outside link.
Lehigh Northampton Airport Authority
Special DistrictPA
Posted
Oct 13, 2026
Nov 13, 2026
One-for-one replacement of an existing roof-mounted cooling tower and replacement of the associated screen wall system. Repairs to the existing roof top mechanical penthouse including man door replacement, removal of existing wall louver, and structural repairs are also included. Additionally, the replacement of an existing IT room air conditioning split system is to be provided. See paragraph GI-1.04 for additional description.
CountyNC
Posted
Oct 9, 2026
Nov 10, 2026
The CCOB Cooling Tower Replacement Project, at which time and place Bids will be opened and read aloud. Single-prime, lump sum bids will be taken for the construction project as indicated in the bidding documents.
Decision makers connected to this RFP from Davidson County School District.