City of Tacoma
This work consists of constructing a stormwater channel through a forested wetland to connect the existing pump station forebay with the outfall and spillway structures, construction of an access ramp to the proposed stormwater channel, and the installation of a flexible check valve at the holding basin outlet structure. Work also includes construction dewatering along with water quality treatment systems, bypass pumping, erosion and pollution control, and site restoration.
Leach Creek Stormwater Holding Basin Modifications - RFB -*Rebid-II*
zip
Release
Jan 14, 2025
Close
Jan 28, 2025