Skagit County Public Hospital District 1
Special DistrictWA
Posted
Nov 3, 2026
Dec 4, 2026
South Campus Chiller Replacement RFP
Project involves the replacement of an exisiting air cooled chilled water chiller using r-22 refrigerant with a new water-cooled chiller, a new primary chiller pump, a new condenser water pump, and the replacement of two existing secondary pumps. System improvements also include refurbishment of an existing rooftop exhaust fan to be used for refriderant exhaust, improvements to the main piping distribution system, and upgrades to the building automation system (bas).
