Special DistrictCA
Jun 22, 2026
Closes
Sep 1, 2026
River Diversion Structure Modernization
Work consists of river diversion structure improvements, includes removal and replacement of existing river diversion equipment and structures, such as access platforms, a medium voltage switchgear, a step-down transformer, a motor control center, vertical turbine pumps, piping, facility lighting, heating, ventilation, and air conditioning, and a programmable logic controller, and construction of a flow metering system including vaults, meters, piping, electrical, and instrumentation.