Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Larose Public Boat Launch Improvements solicitation is for construction improvements including installation of a vinyl sheet pile bulkhead, timber piles, boat ramps, and related work, with a base estimate of $480,000 and an Alternate 1 estimated at $80,000. Electronic bids are to be submitted through Central Auction House and will be received at the Lafourche Parish Civil Service Building until the bid opening. Bidders must hold a Louisiana State Contractor's License in Heavy Construction and obtain plans/specifications via Central Auction House or from the Engineer (Picciola & Associates) for a $100 deposit.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of: replacement of existing ramp with added rip rap protection, installation of new shore interface and dock. Enhancement of launch prep area with pavement markings to aid in boat launching process; Replacement of existing ramp with added rip rap protection, new shore interface, new dock, clearing and grubbing of trees to widen launch area and parking, additional gravel and grading for drainage, solar lighting.
Posted Date
Nov 7, 2025
Due Date
Jan 21, 2026
Release: Nov 7, 2025
Close: Jan 21, 2026
Work consists of: replacement of existing ramp with added rip rap protection, installation of new shore interface and dock. Enhancement of launch prep area with pavement markings to aid in boat launching process; Replacement of existing ramp with added rip rap protection, new shore interface, new dock, clearing and grubbing of trees to widen launch area and parking, additional gravel and grading for drainage, solar lighting.
Premium
Access the largest public sector contact database
Construction of a boat launch site. Work includes but is not limited to clearing and grubbing, dredging, earthwork, single lane concrete ramp with floating docks, and paving. Site improvements include landscaping and miscellaneous site amenities. The launch ramp shall be installed utilizing a push-slab concrete construction method.
Posted Date
Dec 2, 2025
Due Date
Jan 21, 2026
Release: Dec 2, 2025
Close: Jan 21, 2026
Construction of a boat launch site. Work includes but is not limited to clearing and grubbing, dredging, earthwork, single lane concrete ramp with floating docks, and paving. Site improvements include landscaping and miscellaneous site amenities. The launch ramp shall be installed utilizing a push-slab concrete construction method.
AvailableWork includes 85 CY drainage excavation; 72 CY borrow (vehicular measurement) (structural fill); 387 CY aggregate surface course (adjusted vehicular measurement); 59 SY pavement patching (12" minimum thickness); 63 SY portland cement concrete pavement (6" thick); 2 SF sign (type a) (handicap parking) (furnish and install); 1 EA plastic pavement legends and symbols (handicap parking); 32 LF saw cutting asphalt concrete pavement;
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Work includes 85 CY drainage excavation; 72 CY borrow (vehicular measurement) (structural fill); 387 CY aggregate surface course (adjusted vehicular measurement); 59 SY pavement patching (12" minimum thickness); 63 SY portland cement concrete pavement (6" thick); 2 SF sign (type a) (handicap parking) (furnish and install); 1 EA plastic pavement legends and symbols (handicap parking); 32 LF saw cutting asphalt concrete pavement;
AvailableWork includes 85 CY drainage excavation; 72 CY borrow (vehicular measurement) (structural fill); 387 CY aggregate surface course (adjusted vehicular measurement); 59 SY pavement patching (12" minimum thickness); 63 SY portland cement concrete pavement (6" thick); 2 SF sign (type a) (handicap parking) (furnish and install); 1 EA plastic pavement legends and symbols (handicap parking); 32 LF saw cutting asphalt concrete pavement;
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Work includes 85 CY drainage excavation; 72 CY borrow (vehicular measurement) (structural fill); 387 CY aggregate surface course (adjusted vehicular measurement); 59 SY pavement patching (12" minimum thickness); 63 SY portland cement concrete pavement (6" thick); 2 SF sign (type a) (handicap parking) (furnish and install); 1 EA plastic pavement legends and symbols (handicap parking); 32 LF saw cutting asphalt concrete pavement;
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis