Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Annapolis is soliciting bids for installation of a timber ramp, floating dock, and aluminum gangway, plus removal of existing boat launch and bollards and construction of a reinforced concrete boat ramp with imbricated rock walls at Tucker Street and 6th Street End Park. The project is split into Task 1 (floating dock, timber ramp, aluminum gangway) and Task 2 (removal, site work, reinforced concrete ramp, rock walls). Interested bidders are invited to a virtual pre-bid meeting; the listing points bidders to the official eMMA source for full solicitation documents and instructions.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Project consists of pump improvements. This project consists of, but is not limited to, replacing and upgrading pump systems at the jackson street parking ramp; including new pumps, piping, valves, electrical components, and controls, along with required demolition, temporary bypass pumping, and all incidental work needed. See outside link.
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Close: Dec 18, 2025
Project consists of pump improvements. This project consists of, but is not limited to, replacing and upgrading pump systems at the jackson street parking ramp; including new pumps, piping, valves, electrical components, and controls, along with required demolition, temporary bypass pumping, and all incidental work needed. See outside link.
AvailableProcurement for the purchase and installation of a Vortex aquatic splash pad at North Street Park.
Posted Date
Dec 1, 2025
Due Date
Dec 16, 2025
Release: Dec 1, 2025
Close: Dec 16, 2025
Procurement for the purchase and installation of a Vortex aquatic splash pad at North Street Park.
AvailableStreet improvements.
Posted Date
Dec 10, 2025
Due Date
Jan 15, 2026
Release: Dec 10, 2025
Close: Jan 15, 2026
Street improvements.
AvailableThis project shall consist of the installation of a geo textile filter curtain within the lake to enclose the work area to be further encapsulated with a structural cofferdam to construct a new steel reinforced dual lane concrete boat ramp with centered dock abutment that will require deepening the existing lakebed to accommodate a steeper ramp pitch and deeper lakeward approach area. The existing ramp will be removed and disposed of off-site and existing shore wall will be modified to accommodate the new boat ramp. A bituminous ramp approach apron and ADA dedicated parking area will also be constructed atop the existing gravel surface.
Posted Date
Nov 7, 2025
Due Date
Dec 19, 2025
Release: Nov 7, 2025
Close: Dec 19, 2025
This project shall consist of the installation of a geo textile filter curtain within the lake to enclose the work area to be further encapsulated with a structural cofferdam to construct a new steel reinforced dual lane concrete boat ramp with centered dock abutment that will require deepening the existing lakebed to accommodate a steeper ramp pitch and deeper lakeward approach area. The existing ramp will be removed and disposed of off-site and existing shore wall will be modified to accommodate the new boat ramp. A bituminous ramp approach apron and ADA dedicated parking area will also be constructed atop the existing gravel surface.