Town of Concrete Professional Services Roster (Request for Qualification)
Provide architects, engineers, architectural landscaping and consulting/professional firms in connection with performing professional services.
Description: Provide inspection services for large diameter water delivery pipelines utilizing proven inspection technologies on an on-call basis.
SpecialDistrict · CA, US
From the first pre-RFP signals to the published RFP and its files.
Capital improvement plan
Metropolitan planned Phase 1 to install access infrastructure and conduct risk-based inspections and condition assessments of high-priority reinforced concrete, welded steel, and cast-iron pipelines.
Rehabilitation of Metallic and Concrete Pipelines Phase 1 - Select High Priority Feeders Metropolitan's water delivery system consists of 830 miles of pipelines, of which 670 miles are comprised of reinforced concrete, welded steel, and cast-iron pipe. The majority of these pipelines were installed over 50 years ago. This project will install permanent…
Metropolitan Water District of Southern California Capital Investment Plan 2026-2028
Capital improvement plan · 2026
Rehabilitation of Metallic and Concrete Pipelines Phase 1 - Select High Priority Feeders Metropolitan's water delivery system consists of 830 miles of pipelines, of which 670 miles are comprised of reinforced concrete, welded steel, and cast-iron pipe. The majority of these pipelines were installed over 50 years ago. This project will install permanent…
Engineering, Operations, And Technology Committee Meeting
Agenda packet · Apr 13, 2026
Rehabilitation of Metallic and Concrete Pipelines Phase 1 - Select High Priority Feeders Metropolitan's water delivery system consists of 830 miles of pipelines, of which 670 miles are comprised of reinforced concrete, welded steel, and cast-iron pipe. The majority of these pipelines were installed over 50 years ago. This project will install permanent…
Metropolitan Water District of Southern California Capital Investment Plan 2026-2028
Capital improvement plan · Jun 1, 2026
Agenda packet
133 days before RFP
Metropolitan staff is preparing an RFP for the sixth cycle of PCCP inspections, including planned 2026/27 inspections and a large-diameter Foothill Feeder inspection using a free-swimming tool.
Staff continues to perform regular electromagnetic inspections of all PCCP lines in the system. A complete cycle of inspecting all PCCP lines takes approximately five years. The fifth inspection cycle is nearing completion. In 2025, staff completed inspections of 18 miles of PCCP, including the Box Springs Feeder and West Valley Feeder No. 1. Staff is…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (19 days left)
Engineering, Operations, and Technology Committee Meeting Schedule
Agenda packet · Jun 8, 2026
This project performs the fifth cycle of inspections for Metropolitan's unrehabilitated prestressed concrete cylinder pipe (PCCP) lines. Approximately 146.4 miles of PCCP inspection was initiated in 2023 and will be completed in 2028. Inspection activities include pipeline shutdowns, dewatering, electromagnetic and visual inspections, and condition…
Engineering, Operations, and Technology Committee Agenda
Meeting agenda · Sep 14, 2026
To ensure continued reliability of Metropolitan's PCCP pipelines, staff recommends amending the existing inspection agreement with Pure Technologies to allow the added inspection of the Foothill Feeder in the fall of 2026 with a free-swimming inspection tool, perform a follow-up re-inspection of PCCP portions of the Allen- McColloch Pipeline, and complete…
Board Of Directors Meeting
Meeting agenda · Jul 14, 2026
Electromagnetic Inspections of PCCP Lines (Sixth Cycle) All PCCP lines within the distribution system are inspected every three to seven years. The frequency is based on the condition and history of repairs for each feeder. The fifth cycle of electromagnetic testing on Metropolitan's PCCP feeders is nearing completion. This project will perform the sixth…
Metropolitan Water District of Southern California Capital Investment Plan 2026-2028
Capital improvement plan · Jun 1, 2026
Electromagnetic Inspections of PCCP Lines $ 1,100,000 Ongoing Complete the fifth cycle and initiate the sixth
Engineering, Operations, And Technology Committee Meeting
Agenda packet · Apr 13, 2026
All PCCP lines within the distribution system are inspected every three to seven years. The frequency is based on the condition and history of repairs for each feeder. The fifth cycle of electromagnetic testing on Metropolitan's PCCP feeders is nearing completion. This project will perform the sixth cycle of inspections over a six-year period. Planned…
Metropolitan Water District of Southern California Capital Investment Plan 2026-2028
Capital improvement plan · 2026
Decision makers connected to this RFP from Metropolitan Water Dist Of Southern California.
Adjacent opportunities open for bidding right now.
CityWA
Posted
-
Dec 31, 2026
Provide architects, engineers, architectural landscaping and consulting/professional firms in connection with performing professional services.
Special DistrictMS
Posted
Oct 28, 2026
Nov 20, 2026
Provide engineering services for work related to the implementation of drinking water state revolving loan fund(dwsrlf) project.
CityNJ
Posted
Nov 2, 2026
Nov 24, 2026
Provision of architectural services for the township.
CityTX
Posted
Oct 14, 2026
Nov 23, 2026
Provide engineer/architectural/surveying services.