Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Carnation
Landfill pond maintenance project. Improvements shall include to grading plan, HDPE geomembrane liner, geotextile filter fabrics, gravel backfill for drains, quarry spalls, temporary erosion control, temporary traffic control, hydroseed restoration and other work.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Chanhassen
The Project includes approx 2,550 TON Excavation Channel and Pond; 80 CY Random Riprap Class III; 0.5 ACRE Clearing and Grubbing.
Posted Date
Nov 13, 2025
Due Date
Dec 2, 2025
Release: Nov 13, 2025
City of Chanhassen
Close: Dec 2, 2025
The Project includes approx 2,550 TON Excavation Channel and Pond; 80 CY Random Riprap Class III; 0.5 ACRE Clearing and Grubbing.
AvailableCity of Prior Lake
Work includes approx 1 LS dewatering; 2,100 CY excavation - channel and pond; 500 CY excavation; 0.5 AC seeding. See outside link.
Posted Date
Nov 6, 2025
Due Date
Nov 24, 2025
Release: Nov 6, 2025
City of Prior Lake
Close: Nov 24, 2025
Work includes approx 1 LS dewatering; 2,100 CY excavation - channel and pond; 500 CY excavation; 0.5 AC seeding. See outside link.
AvailableCity of Dade City
The project involves the rejuvenation and consolidation of two existing stormwater ponds, including excavation, cleaning, regrading, landscaping, and fencing work to improve stormwater management, site safety, and aesthetics. The work shall include the following tasks: 1. Removal of existing berm. - Remove the existing berm-style wall separating the two stormwater ponds to allow consolidation into a single, larger pond. See attached file for full scope.
Posted Date
Oct 19, 2025
Due Date
Dec 4, 2025
Release: Oct 19, 2025
City of Dade City
Close: Dec 4, 2025
The project involves the rejuvenation and consolidation of two existing stormwater ponds, including excavation, cleaning, regrading, landscaping, and fencing work to improve stormwater management, site safety, and aesthetics. The work shall include the following tasks: 1. Removal of existing berm. - Remove the existing berm-style wall separating the two stormwater ponds to allow consolidation into a single, larger pond. See attached file for full scope.
AvailableCentral Texas Regional Mobility Authority
project will upgrade the existing WQ pond bedding from stone riprap to concrete riprap, replaces existing gabions and maintains the berms & sand filtration pond. 599 CY 6 Install 5" Concrete Riprap with toe wall; 1,135 SY 7 Excavation of Sand Filter Bed (4"); Setup Erosion Control;
Posted Date
Oct 23, 2025
Due Date
Nov 21, 2025
Release: Oct 23, 2025
Central Texas Regional Mobility Authority
Close: Nov 21, 2025
project will upgrade the existing WQ pond bedding from stone riprap to concrete riprap, replaces existing gabions and maintains the berms & sand filtration pond. 599 CY 6 Install 5" Concrete Riprap with toe wall; 1,135 SY 7 Excavation of Sand Filter Bed (4"); Setup Erosion Control;
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis