Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of fourteen vertical landfill gas wells, one condensate knockout station, landfill gas (LFG) header and laterals pipes, and all associated piping fixtures to facilitate proper tie-in to the existing LFG system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of labor, materials, and equipment for the construction of an expansion of the landfill gas collection system at the South Wake Landfill, including installation of extraction wells, collector wells, HDPE collection piping, and related site work.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
Procurement of labor, materials, and equipment for the construction of an expansion of the landfill gas collection system at the South Wake Landfill, including installation of extraction wells, collector wells, HDPE collection piping, and related site work.
AvailableThe Work shall include approx. install one (1) landfill gas blower (to be provided by the successful Bidder) on the existing landfill gas equipment skid. Bolt the new blower/motor package to the existing landfill gas equipment skid by welding threaded studs to the existing skid; Modify and fabricate new suction and discharge piping. Piping shall be furnished by the successful Bidder and fabricated from Schedule 40 - 304 stainless steel pipe. Existing pipe is 8". Piping shall have two (2) each 1/2" National Pipe Thread (NTP) (Female) connections on both the suction and discharge piping for pressure and temperature gauges. Furnish new ten (10) horsepower (HP) motor/blower skid. Gardner Denver TBT brand (or equal) Package with the following specifications: Gardner Denver Sales Order# 5508792 o Serial# PO25949 o NEMA Premium Efficiency three (3) phase motor; 213/5T Frame; Ten (10) HP; 230/460 Volts; 3530 Rotations Per Minute (RPM). 4" Inlet Piping; 3" Outlet Piping; Belt Driven-Belt Style 3VX; Horizontal Belt Guard. Furnish and replace new flexible connectors and gaskets on the suction and discharge sides of the new blower. See outside link for more details.
Posted Date
Jan 7, 2026
Due Date
Feb 9, 2026
Release: Jan 7, 2026
Close: Feb 9, 2026
The Work shall include approx. install one (1) landfill gas blower (to be provided by the successful Bidder) on the existing landfill gas equipment skid. Bolt the new blower/motor package to the existing landfill gas equipment skid by welding threaded studs to the existing skid; Modify and fabricate new suction and discharge piping. Piping shall be furnished by the successful Bidder and fabricated from Schedule 40 - 304 stainless steel pipe. Existing pipe is 8". Piping shall have two (2) each 1/2" National Pipe Thread (NTP) (Female) connections on both the suction and discharge piping for pressure and temperature gauges. Furnish new ten (10) horsepower (HP) motor/blower skid. Gardner Denver TBT brand (or equal) Package with the following specifications: Gardner Denver Sales Order# 5508792 o Serial# PO25949 o NEMA Premium Efficiency three (3) phase motor; 213/5T Frame; Ten (10) HP; 230/460 Volts; 3530 Rotations Per Minute (RPM). 4" Inlet Piping; 3" Outlet Piping; Belt Driven-Belt Style 3VX; Horizontal Belt Guard. Furnish and replace new flexible connectors and gaskets on the suction and discharge sides of the new blower. See outside link for more details.
AvailableRowan County is soliciting developers to finance, design, permit, construct, own, operate and manage landfill gas collection, handling and processing or direct-use systems to convert landfill gas from the Rowan County Landfill into revenue-generating energy or other beneficial products.
Posted Date
Nov 23, 2025
Due Date
Feb 25, 2026
Release: Nov 23, 2025
Close: Feb 25, 2026
Rowan County is soliciting developers to finance, design, permit, construct, own, operate and manage landfill gas collection, handling and processing or direct-use systems to convert landfill gas from the Rowan County Landfill into revenue-generating energy or other beneficial products.
AvailableLandfill gas beneficial reuse.
Posted Date
Nov 26, 2025
Due Date
Feb 17, 2026
Release: Nov 26, 2025
Close: Feb 17, 2026
Landfill gas beneficial reuse.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →