Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of labor, materials, and equipment for the construction of an expansion of the landfill gas collection system at the South Wake Landfill, including installation of extraction wells, collector wells, HDPE collection piping, and related site work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 28 EA of drilling rig platform, 1390 vf 36" dia bore with 8" dia hdpe sdr 11 casing, 970 VF 36" diameter bore with 12" dia sch 80 pvc casing, 280 VF boring refusal, 28 EA 40-mil lldpe geomembrane textured liner flap with neoprene gasket, 18 EA lfg well abandonment, 1270 LF 8" hdpe sdr 11 horizontal collector - 3' deep stone w/ geotextile, 5 EA 7'x7'x7' rock target for horizontal collectors, 610 LF 6" hdpe sdr 17 above grade pipe for horizontal collectors. See attached file.
Posted Date
Jan 12, 2026
Due Date
Feb 27, 2026
Release: Jan 12, 2026
Close: Feb 27, 2026
Work includes 28 EA of drilling rig platform, 1390 vf 36" dia bore with 8" dia hdpe sdr 11 casing, 970 VF 36" diameter bore with 12" dia sch 80 pvc casing, 280 VF boring refusal, 28 EA 40-mil lldpe geomembrane textured liner flap with neoprene gasket, 18 EA lfg well abandonment, 1270 LF 8" hdpe sdr 11 horizontal collector - 3' deep stone w/ geotextile, 5 EA 7'x7'x7' rock target for horizontal collectors, 610 LF 6" hdpe sdr 17 above grade pipe for horizontal collectors. See attached file.
AvailableRowan County is soliciting developers to finance, design, permit, construct, own, operate and manage landfill gas collection, handling and processing or direct-use systems to convert landfill gas from the Rowan County Landfill into revenue-generating energy or other beneficial products.
Posted Date
Nov 23, 2025
Due Date
Feb 25, 2026
Release: Nov 23, 2025
Close: Feb 25, 2026
Rowan County is soliciting developers to finance, design, permit, construct, own, operate and manage landfill gas collection, handling and processing or direct-use systems to convert landfill gas from the Rowan County Landfill into revenue-generating energy or other beneficial products.
AvailableProvide cell 1re landfill expansion. Project includes the following work: general construction of a new 3.0-acre landfill cell including leachate collection system, pump station (including providing electrical service), hdpe piping, stormwater management practices, and related work. The new landfill is adjacent to an existing closed cell and requires the excavation and relocation of municipal solid waste from the existing closed cell to an operating landfill cell on-site. See outside link.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Provide cell 1re landfill expansion. Project includes the following work: general construction of a new 3.0-acre landfill cell including leachate collection system, pump station (including providing electrical service), hdpe piping, stormwater management practices, and related work. The new landfill is adjacent to an existing closed cell and requires the excavation and relocation of municipal solid waste from the existing closed cell to an operating landfill cell on-site. See outside link.
AvailableLandfill gas beneficial reuse.
Posted Date
Nov 26, 2025
Due Date
Feb 17, 2026
Release: Nov 26, 2025
Close: Feb 17, 2026
Landfill gas beneficial reuse.