Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of a new rip-rap revetment system. The work involves processing, sizing, and transporting District-furnished limestone material from an off-site stockpile, followed by the placement of geotextile fabric, bedding stone, and rip-rap along the shoreline.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
AvailablePremium
Access the largest public sector contact database
This work consists of revetment reconstruction and installation, installing large wood and rock features, bank stabilization, erosion control, traffic control, and site restoration.
Posted Date
Dec 10, 2025
Due Date
Jan 6, 2026
Release: Dec 10, 2025
Close: Jan 6, 2026
This work consists of revetment reconstruction and installation, installing large wood and rock features, bank stabilization, erosion control, traffic control, and site restoration.
AvailableProvide a living shoreline system to enhance resilience and protect the transfer station and provide environmental benefits. Mobilization and demobilization; maintenance of traffic (furnish and install); temporary staging area erosion and sediment control (furnish and install); floating turbidity barrier (furnish and install); soil tracking prevention device; 4,788 sf living shoreline creation and shoreline stabilization base material (furnish and install); 10,052 sf living shoreline plantings (furnish and install); 460 ea shoreline stabilization measures (furnish and install); construction surveys; rehabilitation of temporary staging area to original condition; 4,273 sf equivalent shoreline stabilization measures (furnish and install). See outside link.
Posted Date
Oct 23, 2025
Due Date
Jan 6, 2026
Release: Oct 23, 2025
Close: Jan 6, 2026
Provide a living shoreline system to enhance resilience and protect the transfer station and provide environmental benefits. Mobilization and demobilization; maintenance of traffic (furnish and install); temporary staging area erosion and sediment control (furnish and install); floating turbidity barrier (furnish and install); soil tracking prevention device; 4,788 sf living shoreline creation and shoreline stabilization base material (furnish and install); 10,052 sf living shoreline plantings (furnish and install); 460 ea shoreline stabilization measures (furnish and install); construction surveys; rehabilitation of temporary staging area to original condition; 4,273 sf equivalent shoreline stabilization measures (furnish and install). See outside link.
AvailableDesign-Bid-Build. To provide Comprehensive Construction Management and Inspection Services (CMIS) for the Shoreline Drive Realignment Project the Shoreline Drive Realignment Project (Project), a transformative infrastructure initiative designed to reconnect Downtown Long Beach and improve multimodal transportation options. This high-visibility project funded in part by a federal Reconnecting Communities Program grant will realign Shoreline Drive, remove outdated infrastructure barriers, and construct new pedestrian and bicycle-friendly routes.
Posted Date
Nov 11, 2025
Due Date
Jan 8, 2026
Release: Nov 11, 2025
Close: Jan 8, 2026
Design-Bid-Build. To provide Comprehensive Construction Management and Inspection Services (CMIS) for the Shoreline Drive Realignment Project the Shoreline Drive Realignment Project (Project), a transformative infrastructure initiative designed to reconnect Downtown Long Beach and improve multimodal transportation options. This high-visibility project funded in part by a federal Reconnecting Communities Program grant will realign Shoreline Drive, remove outdated infrastructure barriers, and construct new pedestrian and bicycle-friendly routes.