Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of phase 1 - 1,740 LF of 36" thru 15" storm sewers, 835 LF of 18" and 8" sanitary sewer, 14 manholes, 8 inlets, outfall at deep river, 360 linear feet of new curbs along intersection of central avenue and union street, pavement repair, clearing and associated site restoration. Phase 2 - 3,477 LF of 24" thru 12" storm sewers, 13 manholes, 35 inlets, 710 lf of reconstruction of 710 lf along vermillion street consisting of full street replacement, new sidewalks, drive approaches curbs and green space, reconstruction of 200 LF along vanderburg street consisting of full street replacement, new drive approaches and curbs, reconstruction of curbs, sidewalks and drive approaches along north side of central avenue, and associated site restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking qualified firms or consultants to conduct a comprehensive fire station building condition assessment and station location study. Evaluate the six fire stations for: condition assessment narrative; structural integrity and building envelope condition; hvac, plumbing, electrical, and mechanical systems; code and ada compliance; service life and sustainability; deferred maintenance and life cycle costs; space utilization, ergonomics, and operational functionality; service life of operational equipment (doors, windows, paint, sidewalks, concrete, brick work, retaining walls, etc. ); assessment of maintenance approach compared to new construction estimates. See outside link.
Posted Date
Dec 1, 2025
Due Date
Feb 5, 2026
Release: Dec 1, 2025
Close: Feb 5, 2026
Seeking qualified firms or consultants to conduct a comprehensive fire station building condition assessment and station location study. Evaluate the six fire stations for: condition assessment narrative; structural integrity and building envelope condition; hvac, plumbing, electrical, and mechanical systems; code and ada compliance; service life and sustainability; deferred maintenance and life cycle costs; space utilization, ergonomics, and operational functionality; service life of operational equipment (doors, windows, paint, sidewalks, concrete, brick work, retaining walls, etc. ); assessment of maintenance approach compared to new construction estimates. See outside link.
AvailableThe City of Salinas is soliciting qualified contractors to replace the Lake Street Lift Station, with anticipated completion by fall 2028. The scope includes design and construction of a new triplex lift station, new wet well, force main(s), SCADA implementation, and abandonment of existing facilities. This Request for Qualifications (RFQual) for design/construction services has an estimated project value of approximately $15M-$20M.
Posted Date
Jan 13, 2026
Due Date
Feb 13, 2026
Release: Jan 13, 2026
Close: Feb 13, 2026
The City of Salinas is soliciting qualified contractors to replace the Lake Street Lift Station, with anticipated completion by fall 2028. The scope includes design and construction of a new triplex lift station, new wet well, force main(s), SCADA implementation, and abandonment of existing facilities. This Request for Qualifications (RFQual) for design/construction services has an estimated project value of approximately $15M-$20M.
Provide utility customer services building envelope maintenance & repair.
Posted Date
Jan 14, 2026
Due Date
Jan 29, 2026
Release: Jan 14, 2026
Close: Jan 29, 2026
Provide utility customer services building envelope maintenance & repair.
AvailableThe City of Salinas is soliciting qualifications for a design-build team to replace the Lake Street Lift Station, including a new triplex lift station, wet well, force main, and a SCADA platform. The project scope covers 100% design through construction and commissioning with an estimated budget of $15–$20 million and an expected completion by fall 2028. A mandatory remote pre-bid meeting is scheduled for 2026-01-21; questions are due 2026-01-14 and proposals are due 2026-02-13.
Posted Date
Jan 13, 2026
Due Date
Feb 13, 2026
Release: Jan 13, 2026
Close: Feb 13, 2026
The City of Salinas is soliciting qualifications for a design-build team to replace the Lake Street Lift Station, including a new triplex lift station, wet well, force main, and a SCADA platform. The project scope covers 100% design through construction and commissioning with an estimated budget of $15–$20 million and an expected completion by fall 2028. A mandatory remote pre-bid meeting is scheduled for 2026-01-21; questions are due 2026-01-14 and proposals are due 2026-02-13.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis