Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Salinas is soliciting qualified contractors to replace the Lake Street Lift Station, with anticipated completion by fall 2028. The scope includes design and construction of a new triplex lift station, new wet well, force main(s), SCADA implementation, and abandonment of existing facilities. This Request for Qualifications (RFQual) for design/construction services has an estimated project value of approximately $15M-$20M.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Salinas is soliciting qualifications for a design-build team to replace the Lake Street Lift Station, including a new triplex lift station, wet well, force main, and a SCADA platform. The project scope covers 100% design through construction and commissioning with an estimated budget of $15–$20 million and an expected completion by fall 2028. A mandatory remote pre-bid meeting is scheduled for 2026-01-21; questions are due 2026-01-14 and proposals are due 2026-02-13.
Posted Date
Jan 13, 2026
Due Date
Feb 13, 2026
Release: Jan 13, 2026
Close: Feb 13, 2026
The City of Salinas is soliciting qualifications for a design-build team to replace the Lake Street Lift Station, including a new triplex lift station, wet well, force main, and a SCADA platform. The project scope covers 100% design through construction and commissioning with an estimated budget of $15–$20 million and an expected completion by fall 2028. A mandatory remote pre-bid meeting is scheduled for 2026-01-21; questions are due 2026-01-14 and proposals are due 2026-02-13.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of rehabilitation of existing cline street lift station including removal and replacement of existing pumps and piping.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
Work consists of rehabilitation of existing cline street lift station including removal and replacement of existing pumps and piping.
AvailableFor the replacement of all plumbing, electrical and mechanical equipment housed in the lift station.
Posted Date
Jan 11, 2026
Due Date
Feb 5, 2026
Release: Jan 11, 2026
Close: Feb 5, 2026
For the replacement of all plumbing, electrical and mechanical equipment housed in the lift station.
AvailableProvide lift station pump repairs.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Provide lift station pump repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →