Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Elementary School Cafeteria Renovations and District-Wide HVAC Replacements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes elementary bathroom renovations.
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
Work includes elementary bathroom renovations.
AvailablePremium
Access the largest public sector contact database
Elementary School HVAC Renovations. Replacement of (5) Rooftop Heat Recovery Units with Dedicated Outside Air System that is an air cooled, DX Rooftop Unit with hot gas reheat, with an energy recovery wheel, and natural gas fired furnace for heating. Re-use existing ductwork. Replace Library RTU with air cooled DX Rooftop unit with hot gas reheat to address humidity, energy recovery wheel as needed per energy code, and natural gas fired furnace for heating. Re-use existing ductwork. All new RTUs to be air cooled DX with hot gas reheat, energy recovery (as needed per code), with natural gas fired furnace for heating.
Posted Date
Oct 3, 2025
Due Date
Dec 17, 2025
Release: Oct 3, 2025
Close: Dec 17, 2025
Elementary School HVAC Renovations. Replacement of (5) Rooftop Heat Recovery Units with Dedicated Outside Air System that is an air cooled, DX Rooftop Unit with hot gas reheat, with an energy recovery wheel, and natural gas fired furnace for heating. Re-use existing ductwork. Replace Library RTU with air cooled DX Rooftop unit with hot gas reheat to address humidity, energy recovery wheel as needed per energy code, and natural gas fired furnace for heating. Re-use existing ductwork. All new RTUs to be air cooled DX with hot gas reheat, energy recovery (as needed per code), with natural gas fired furnace for heating.
AvailableWork includes school cafeteria renovations.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Work includes school cafeteria renovations.
AvailableCeiling replacements and interior renovations at the school.
Posted Date
Nov 23, 2025
Due Date
Dec 18, 2025
Release: Nov 23, 2025
Close: Dec 18, 2025
Ceiling replacements and interior renovations at the school.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis