Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Kentucky Transportation Cabinet
Project consists of 948 TN, DGA base; 433 TN, CL2 asphalt base 0.75D PG64-22; 124 TN, CL2 asphalt surface 0.38D PG64-22; 260 CY, roadway excavation; 575 LF, guardrail-steel w beam-s face; 720 LF, remove guardrail; 135 SF, temporary signs; 820 LF, pave striping-temp paint-6 IN; 228 LF, pave striping-dur ty 1-6 IN W; 30 LF, pave striping-dur ty 1-6 IN Y; 1,082 LF, pave striping-spray thermo-6 IN W; 130 LF, pave striping-spray thermo-6 IN Y; 114.70 CY, concrete-class AA; 8,360 SF, concrete sealing; 228 LF, classic bridge rail. See attached files.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Kentucky Transportation Cabinet
Address condition of ky-90
Posted Date
-
Due Date
Dec 11, 2025
Kentucky Transportation Cabinet
Close: Dec 11, 2025
Address condition of ky-90
Kentucky Transportation Cabinet
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Work includes 458 CY of roadway excavation; 112 CY of granular embankment; 216 SF of temporary signs; 510 SY of fabric-geotextile class 1; 268 LF of pave striping-perm paint-4 in; 63 LF of pave striping-dur ty 1-4 in y; 91 CY of structure granular backfill; 50 LF oarmored edge for concrete; 90 LF of test piles; 286 LF of piles-steel hp12x53; 31 CY of concrete-class a; 300 LF of precast pc box beam cb21; 4,850 SF of concrete sealing; 100 LF of rail system side mounted mgs and associated works.
Posted Date
Nov 20, 2025
Due Date
Dec 11, 2025
Release: Nov 20, 2025
Kentucky Transportation Cabinet
Close: Dec 11, 2025
Work includes 458 CY of roadway excavation; 112 CY of granular embankment; 216 SF of temporary signs; 510 SY of fabric-geotextile class 1; 268 LF of pave striping-perm paint-4 in; 63 LF of pave striping-dur ty 1-4 in y; 91 CY of structure granular backfill; 50 LF oarmored edge for concrete; 90 LF of test piles; 286 LF of piles-steel hp12x53; 31 CY of concrete-class a; 300 LF of precast pc box beam cb21; 4,850 SF of concrete sealing; 100 LF of rail system side mounted mgs and associated works.
Kentucky Transportation Cabinet
Work includes 39,101 SY of fine milling; 80 LF of storm sewer pipe-18 in; 1,643 cy of roadway excavation; 5,125 LF of guardrail removal; 500 SF of temporary signs; 19,245 LF of edgeline rumble strips; 2,903 SY of erosion control blanket; 1,452 SY of temp seeding and protection; 41,276 LF of pave striping-temp paint-6"; 20,662 LF of pave striping-thermo-6 in w; 230 LF of pave mark temp paint stop bar; 9,805 LF of centerline rumble strips; 351,909 SF of pave mount infrared temp equipment and associated works.
Posted Date
Nov 20, 2025
Due Date
Dec 11, 2025
Release: Nov 20, 2025
Kentucky Transportation Cabinet
Close: Dec 11, 2025
Work includes 39,101 SY of fine milling; 80 LF of storm sewer pipe-18 in; 1,643 cy of roadway excavation; 5,125 LF of guardrail removal; 500 SF of temporary signs; 19,245 LF of edgeline rumble strips; 2,903 SY of erosion control blanket; 1,452 SY of temp seeding and protection; 41,276 LF of pave striping-temp paint-6"; 20,662 LF of pave striping-thermo-6 in w; 230 LF of pave mark temp paint stop bar; 9,805 LF of centerline rumble strips; 351,909 SF of pave mount infrared temp equipment and associated works.
Kentucky Transportation Cabinet
Work includes 7,350 CY of roadway excavation; 275 LF of guardrail-steel w beam-s face; removal of 137 LF of guardrail; 85.25 SF of temporary signs; 60 LF of edge key; 12 SF of sbm alum sheet signs. 080 in; 1,460 LF of pave striping-perm paint-4 in ; 6 LF of pave mark temp paint stop bar-24 in; 2,708 CY of structure granular backfill; 52. 30 LF of armored edge for concrete; 3,441 LF of piles-steel hp12x53; 550 CY of concrete-class a; 7,788 SF of concrete sealing; 206 LF of rail system type t631 and associated works.
Posted Date
Nov 20, 2025
Due Date
Dec 11, 2025
Release: Nov 20, 2025
Kentucky Transportation Cabinet
Close: Dec 11, 2025
Work includes 7,350 CY of roadway excavation; 275 LF of guardrail-steel w beam-s face; removal of 137 LF of guardrail; 85.25 SF of temporary signs; 60 LF of edge key; 12 SF of sbm alum sheet signs. 080 in; 1,460 LF of pave striping-perm paint-4 in ; 6 LF of pave mark temp paint stop bar-24 in; 2,708 CY of structure granular backfill; 52. 30 LF of armored edge for concrete; 3,441 LF of piles-steel hp12x53; 550 CY of concrete-class a; 7,788 SF of concrete sealing; 206 LF of rail system type t631 and associated works.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →