Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project will consist of the relocation of approx. 730 LF of 8" C900 PVC water main by trenching methods, along KY 358 near the 11:45 mile marker. This relocation project is in response to the KYTC project to extend Bobo Rd to Ky-358.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Watermain lining and replacement of watermain. The work will also include: watermain lining of 12", 10", 8" and 6" ductile iron watermain. Replacement of 6 "watermain with new 8" di watermain. Replacement of all service b-boxes. Replacement of all existing hydrants with new ej hydrants. Replacement of all existing valves with new rw valves. New service lines on the woburn ct where main is being replaced. Four (4) full service line replacements from b-box to meter near crystal tree subdivision. Replacement of storm pipe with watermain quality pipe at various crossings. Curb replacement. Sidewalk replacement. Asphalt replacement. Sod restoration. Possible road closure and detour signage and planning.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Watermain lining and replacement of watermain. The work will also include: watermain lining of 12", 10", 8" and 6" ductile iron watermain. Replacement of 6 "watermain with new 8" di watermain. Replacement of all service b-boxes. Replacement of all existing hydrants with new ej hydrants. Replacement of all existing valves with new rw valves. New service lines on the woburn ct where main is being replaced. Four (4) full service line replacements from b-box to meter near crystal tree subdivision. Replacement of storm pipe with watermain quality pipe at various crossings. Curb replacement. Sidewalk replacement. Asphalt replacement. Sod restoration. Possible road closure and detour signage and planning.
AvailableThis RFP is for the installation of approximately 690 LF of ductile iron water mains along Howard Boulevard, including fittings, service connections, components, and site restoration.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
This RFP is for the installation of approximately 690 LF of ductile iron water mains along Howard Boulevard, including fittings, service connections, components, and site restoration.
AvailableWatermain Replacement.
Posted Date
Dec 17, 2025
Due Date
Jan 8, 2026
Release: Dec 17, 2025
Close: Jan 8, 2026
Watermain Replacement.
AvailableWork includes the installation of approx 6,266 LF of 8" di waterline, 92 LF of 16" steel casing pipe, 1 fire hydrant assembly, and related appurtenances.
Posted Date
Dec 15, 2025
Due Date
Jan 8, 2026
Release: Dec 15, 2025
Close: Jan 8, 2026
Work includes the installation of approx 6,266 LF of 8" di waterline, 92 LF of 16" steel casing pipe, 1 fire hydrant assembly, and related appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →