Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes the installation of approx 6,266 LF of 8" di waterline, 92 LF of 16" steel casing pipe, 1 fire hydrant assembly, and related appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of 1,130 L.G. of 12" water line relocation and 360 LF of 8" waterline extension.
Posted Date
Dec 12, 2025
Due Date
Dec 30, 2025
Release: Dec 12, 2025
Close: Dec 30, 2025
Project consists of 1,130 L.G. of 12" water line relocation and 360 LF of 8" waterline extension.
AvailablePremium
Access the largest public sector contact database
Skanska is soliciting subcontractor and supplier bids for the SR 520 Portage Bay Bridge Replacement project’s 42‑inch waterline relocation/boring scope (RFP 060). Bids are due December 19, 2025 at 12:00 PM, with plans/specs and submissions managed via BuildingConnected and OMWBE‑listed inclusivity goals.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Skanska is soliciting subcontractor and supplier bids for the SR 520 Portage Bay Bridge Replacement project’s 42‑inch waterline relocation/boring scope (RFP 060). Bids are due December 19, 2025 at 12:00 PM, with plans/specs and submissions managed via BuildingConnected and OMWBE‑listed inclusivity goals.
Works include approx. 500 LF of 10" HDPE water line installed by HDD (in rock); 450 LF of 8" DIP water line; 20 LF of concrete sidewalk & curb repair; 100 rock excavation. See outside link.
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
Works include approx. 500 LF of 10" HDPE water line installed by HDD (in rock); 450 LF of 8" DIP water line; 20 LF of concrete sidewalk & curb repair; 100 rock excavation. See outside link.
AvailableProject includes approx. 5,000 LF of waterline replacement to 8 PVC waterline service connections to the new 8 waterline will extend from the existing meter pits. Valves will be analyzed to allow for phasing of switch-over from the existing waterline to the waterline replacement.
Posted Date
Dec 1, 2025
Due Date
Jan 6, 2026
Release: Dec 1, 2025
Close: Jan 6, 2026
Project includes approx. 5,000 LF of waterline replacement to 8 PVC waterline service connections to the new 8 waterline will extend from the existing meter pits. Valves will be analyzed to allow for phasing of switch-over from the existing waterline to the waterline replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis