Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Paducah Water's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Paducah Water
Construction of a new 15,675 square foot building to house operations for Paducah Water, including office space, training areas, restrooms, warehouse and truck bays. Work includes but is not limited to pre-engineered metal building system, cold formed metal framing, gypsum board, wood doors, hollow metal doors and frames, acoustic panel ceiling systems, interior painting, fire suppression, mechanical and electrical systems, as well as associated site work and landscaping.
Posted Date
-
Due Date
Jan 20, 2026
Release: -
Paducah Water
Close: Jan 20, 2026
Construction of a new 15,675 square foot building to house operations for Paducah Water, including office space, training areas, restrooms, warehouse and truck bays. Work includes but is not limited to pre-engineered metal building system, cold formed metal framing, gypsum board, wood doors, hollow metal doors and frames, acoustic panel ceiling systems, interior painting, fire suppression, mechanical and electrical systems, as well as associated site work and landscaping.
AvailablePaducah Water
Provide two, 6.7 MGD forced-draft aerators for reducing total gas saturation at the municipal drinking water treatment plant.
Posted Date
Aug 28, 2025
Due Date
Sep 16, 2025
Release: Aug 28, 2025
Paducah Water
Close: Sep 16, 2025
Provide two, 6.7 MGD forced-draft aerators for reducing total gas saturation at the municipal drinking water treatment plant.
Paducah Water
This project will consist of the relocation of approx. 730 LF of 8" C900 PVC water main by trenching methods, along KY 358 near the 11:45 mile marker. This relocation project is in response to the KYTC project to extend Bobo Rd to Ky-358.
Posted Date
-
Due Date
Jun 17, 2025
Paducah Water
Close: Jun 17, 2025
This project will consist of the relocation of approx. 730 LF of 8" C900 PVC water main by trenching methods, along KY 358 near the 11:45 mile marker. This relocation project is in response to the KYTC project to extend Bobo Rd to Ky-358.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.