CityVA
Jul 17, 2026
Closes
Aug 7, 2026
Reroof Warehouse RFP
Work include replacement of the existing roof with a new white metal roofing system.
Description: The work includes the removal of all existing vertical wood siding and batten strips from the Visitor Center/Headquarters Building. This includes, but is not limited to, the removal of cedar/plywood siding, batten strips, trim, wood soffits and fascia, J-channels and any metal flashing beneath the siding.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
These related opportunities are still open for bidding.
CityVA
Jul 17, 2026
Closes
Aug 7, 2026
Work include replacement of the existing roof with a new white metal roofing system.
Special DistrictKS
Jul 23, 2026
Closes
Aug 16, 2026
Work includes removal and replacement of kitchen cabinets and countertops, replacement of bathroom vanities, and installation of new vinyl plank (LVP) flooring throughout the entire downstairs area.
FederalUT
Jul 21, 2026
Closes
Aug 14, 2026
Work includes: 1. Remove and dispose of existing cedar wood shingle roofing system. 2. The existing plywood sheathing to remain. 3. Remove & reinstall the lightning protection rod, lightning protection cables across the roof, clamps & fasteners across the roof, and appurtenances across the roof. 4. Install a multi-width synthetic cedar shingle roofing system as specified in Specification.
CityWI
Jul 17, 2026
Closes
Aug 4, 2026
Removal and replacement of membrane roofing, tapered insulation, modifications to blocking and wall panels as required, replacement of roof drains, piping and piping insulation, replacement of fascia, curbs and roof penetrations.
Procurement and program contacts connected to U.S. Fish and Wildlife Service.