Special DistrictAK
Aug 12, 2026
Closes
Oct 12, 2026
Tyee Lake Third Turbine Construction Project (Request for Proposal)
Project consists install, integrate, start up, and commission a third hydroelectric generating unit in an existing powerhouse bay. Owner will furnish the turbine, generator, transformer, governor, exciter, controls, and other major equipment. Work is supported by an existing detailed 3D design/model, substantially reducing design and constructability risk.