CityCA
Posted
Oct 21, 2026
Nov 20, 2026
River West Fresno Eaton Trail Extension Phase 1 RFP
40,840 CY Earthwork (F); 3,535 tons Hot Mix Asphalt, Type A; 5,119 tons of Aggregate Base (Class II).
Description: Traffic control; erosion & sediment control; construction engineering; 305 tons, 1.4" HMA, surface; 479 tons, 2.5" HMA intermediate; 270 tons, 4.5" HMA intermediate patch; 1,289 tons, 6" no. 53 stone (Path); 870 tons, 6" no. 53 stone shoulder; 15 ea, 30" dia. Nyloplast drainage structures incl casting; 195 LF, 10" HDPE pipe; 211 LF, 12" HDPE pipe; 1,181 LF, 15" HDPE pipe; 1,141 LF, 18" HDPE pipe; 11 ea, 10" FES; 7 ea, 12" FES; 1 ea, 18" FES; 193', 12" CMP; 16 ea, 12" FES; driveway culvert removal; 3,180 LF, roadside swale restoration; restoring final grading, seeding & mulch.
County · IN, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Kosciusko County.
These related opportunities are still open for bidding.
CityCA
Posted
Oct 21, 2026
Nov 20, 2026
40,840 CY Earthwork (F); 3,535 tons Hot Mix Asphalt, Type A; 5,119 tons of Aggregate Base (Class II).
CountyIN
Posted
-
Dec 1, 2026
The proposed construction will include cleaning and coating (painting) of the steel truss bridge, truss repairs, cleaning of bearings, timber deck replacement, and all incidental work required, as specified in the Contract Document and Plans.
Special DistrictIL
Posted
Sep 24, 2026
Jan 31, 2027
This notice provides advance public notice of an upcoming bid opportunity. No documents are currently available. Located in Madison County, Illinois. Confluence Trail Reconstruction Phase 2, aka Canal Road in Wood River to Russell Commons in Alton. Estimated IFB release date for construction: January 2027. Final plans/specs are complete. Awaiting Corps of Engineers permit approval.
Ohio Department of Transportation
State AgencyOH
Posted
-
Dec 31, 2099
Construction of a 2.34-mile paved shared use path, including bridge rehabilitation/reconstruction, culvert replacement, safety rail, equestrian staging, full depth shoulder work, and intersection pedestrian facility improvements.