Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This IFB, issued by Lehigh County Authority, seeks electrical equipment for the Kline's Island WWTP wet weather upgrades. The scope includes providing shop drawings, O&M manuals, furnishing and delivering electrical equipment to the plant site. Additionally, the selected vendor will provide support services such as installation supervision, testing, and training as specified in the contract documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Fabrication and delivery of a complete ultraviolet disinfection and ancillary components, design assistance, submittals and shop drawings, operations manual, factory testing, on-site testing and start-up, testing, training and post-commissioning assistance.
Posted Date
Dec 1, 2025
Due Date
Dec 23, 2025
Release: Dec 1, 2025
Close: Dec 23, 2025
Fabrication and delivery of a complete ultraviolet disinfection and ancillary components, design assistance, submittals and shop drawings, operations manual, factory testing, on-site testing and start-up, testing, training and post-commissioning assistance.
Premium
Access the largest public sector contact database
Provide fabrication and delivery of a complete solids dewatering system and ancillary components, design assistance, submittals and shop drawings, operations manual, factory testing, on-site testing and start-up, testing, training and post-commissioning assistance.
Posted Date
Dec 1, 2025
Due Date
Dec 23, 2025
Release: Dec 1, 2025
Close: Dec 23, 2025
Provide fabrication and delivery of a complete solids dewatering system and ancillary components, design assistance, submittals and shop drawings, operations manual, factory testing, on-site testing and start-up, testing, training and post-commissioning assistance.
AvailableProject generally consists of improvements to the existing pretreatment building including replacement of screening equipment, grit equipment, pumps and blowers (including vfds), influent sampler(s), flow meter(s), gates and valves, and associated piping along with renovation of existing pre-engineered metal building (including hvac improvements), installation of new bollards, and electrical improvements; See attached file.
Posted Date
Dec 3, 2025
Due Date
Jan 12, 2026
Release: Dec 3, 2025
Close: Jan 12, 2026
Project generally consists of improvements to the existing pretreatment building including replacement of screening equipment, grit equipment, pumps and blowers (including vfds), influent sampler(s), flow meter(s), gates and valves, and associated piping along with renovation of existing pre-engineered metal building (including hvac improvements), installation of new bollards, and electrical improvements; See attached file.
AvailableThe Projects shall include; new Influent Pumping Station and Influent Flow Tunnel, new Screening Facility, new Grit Removal Facility, Flow Splitting Chamber, High-Rate Treatment Facility with UV Disinfection and Solids Handling Systems, In-Plant Conveyance; Site Improvements and Electrical and SCADA Improvements.
Posted Date
Nov 11, 2025
Due Date
Dec 12, 2025
Release: Nov 11, 2025
Close: Dec 12, 2025
The Projects shall include; new Influent Pumping Station and Influent Flow Tunnel, new Screening Facility, new Grit Removal Facility, Flow Splitting Chamber, High-Rate Treatment Facility with UV Disinfection and Solids Handling Systems, In-Plant Conveyance; Site Improvements and Electrical and SCADA Improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis