Conejo Valley Unified School District
School DistrictCA
Posted
Oct 15, 2026
Oct 30, 2026
Epoxy Flooring @ Kitchen RFP
1. Clean Surface of grease, oils, and any contaminants before commencing prep work. 2. Remove the existing failing epoxy floor system in its entirety with planetary grinders and vacuum to minimize dust. 3. Floor Prep: Grind floor with abrasive diamond tools to achieve a concrete surface profile of 3 (CSP3) 4. Surface Repairs: Repair all surface imperfections, cracks divots spalled concrete with an epoxy polymer concrete mortar to pre-fill and repair as necessary prior to the application of the floor system overlay. 5. Install a 6” integral sanitary cove base at all walls, to achieve a seamless floor to wall polymer overlay floor system. 6. Apply a 1/8” to 3/16” Urethane cement slurry followed by a full silica quartz broadcast onto the wet polymer overlay. 7. After the overlay has dried remove excess quartz sand prior to the placement of the finished topcoat. 8. Topcoat: Apply one coat of UV and chemical resistant pigmented PolyAspartic topcoat at a rate of 12 to 16 dry mils.
