Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of 1,112 LF of 6" PVC water line and 887 LF of 8" PVC sewer line. 0.12 Tn DI fittings, complete with restraints and concrete blocking; 2 Ea of 6" MJ gate valve, installed, tested and complete; 1 Ea fire hydrant assembly, installed, tested and complete; 890 LF of 8" SDR 26 cl160 PVC sanitary sewer line, installed, tested, cleaned up, and complete with tracer tape. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction to: replace the 24" transmission waterline; construct a new 8-in waterline; build a new sanitary sewer; transportation improvements.
Posted Date
Dec 15, 2025
Due Date
Jan 30, 2026
Release: Dec 15, 2025
Close: Jan 30, 2026
Construction to: replace the 24" transmission waterline; construct a new 8-in waterline; build a new sanitary sewer; transportation improvements.
AvailableInstallation of approximately 11,400 feet of 8" and 16" PVC waterline and 10,300 feet of 12" PVC sanitary sewer.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
Installation of approximately 11,400 feet of 8" and 16" PVC waterline and 10,300 feet of 12" PVC sanitary sewer.
AvailableThe project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
The project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
Work includes approx. 74 lf of 8" sanitary sewer pipe (open cut); 10 LF of 10" Sanitary sewer pipe, (open cut); 105 LF of 15" Trenchless construction; 3,481 LF of CCTV inspection (pre-construction); 5 EA of (4' dia) sanitary sewer manhole (0 - 6 ft). See outside link.
Posted Date
Dec 17, 2025
Due Date
Jan 28, 2026
Release: Dec 17, 2025
Close: Jan 28, 2026
Work includes approx. 74 lf of 8" sanitary sewer pipe (open cut); 10 LF of 10" Sanitary sewer pipe, (open cut); 105 LF of 15" Trenchless construction; 3,481 LF of CCTV inspection (pre-construction); 5 EA of (4' dia) sanitary sewer manhole (0 - 6 ft). See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis