Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
County of Hawaii
DESIGN-BUILD: design, permitting, and construction of wastewater treatment process improvements to achieve treated r-1 wastewater effluent that satisfies the water quality standards. The process improvements shall include equipment for both the liquid and solids waste streams. The liquid process stream improvements shall consist of the installation of a packaged dissolved air flotation (daf) and membrane bioreactor (mbr) tank systems with ultra-violet (uv) disinfection prior to disposal. The solids shall be dewatered by screw press equipment. Site improvements shall consist of installation of site grading, pump stations, potable waterlines, gravity sewerlines, forcemains, storage sheds, concrete pads, mechanical equipment, electrical power and communication systems, and gravel road construction. Should any existing utility service be insufficient for the proposed process improvements, the contractor shall complete any engineering, permitting, and site work to ensure that the necessary power, water, and communications for the proposed package wastewater treatment facility is available. Upon completion the improvements at the wastewater treatment facility contractor shall provide support during startup and commissioning prior to final acceptance of the project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Saskatoon
The City of Saskatoon seeks a qualified contractor to perform improvements, upgrades, and replacement of failing assets and equipment at the Wastewater Treatment Plant (WWTP), including piping, HVAC, and other mechanical sub‑systems. Solicitation documents and submissions are handled via the City’s Bids & Tenders portal.
Posted Date
Oct 31, 2025
Due Date
Dec 16, 2025
Release: Oct 31, 2025
Saskatoon
Close: Dec 16, 2025
The City of Saskatoon seeks a qualified contractor to perform improvements, upgrades, and replacement of failing assets and equipment at the Wastewater Treatment Plant (WWTP), including piping, HVAC, and other mechanical sub‑systems. Solicitation documents and submissions are handled via the City’s Bids & Tenders portal.
AvailableCity of Fair Oaks Ranch
The City of Fair Oaks Ranch is soliciting proposals for the Wastewater Treatment Plant Phase 1 Expansion project. Details and instructions are contained in the Request for Proposals and associated documents on the project page.
Posted Date
-
Due Date
Dec 18, 2025
City of Fair Oaks Ranch
Close: Dec 18, 2025
The City of Fair Oaks Ranch is soliciting proposals for the Wastewater Treatment Plant Phase 1 Expansion project. Details and instructions are contained in the Request for Proposals and associated documents on the project page.
AvailableMaryland Environmental Service
Construction of new water and wastewater treatment plants, water storage tank, water mains, sewage pump station, sanitary force main, gravity sewer pipes, demolition of the existing wastewater treatment plant, new RV dump station, clearing, inspection/rehabilitation of existing sewer mains, demolition of camp sites and other improvements.
Posted Date
Oct 30, 2025
Due Date
Dec 15, 2025
Release: Oct 30, 2025
Maryland Environmental Service
Close: Dec 15, 2025
Construction of new water and wastewater treatment plants, water storage tank, water mains, sewage pump station, sanitary force main, gravity sewer pipes, demolition of the existing wastewater treatment plant, new RV dump station, clearing, inspection/rehabilitation of existing sewer mains, demolition of camp sites and other improvements.
AvailableCity of O'Fallon
Demolition of existing dry scrubber odor control system and installation of a new bioscrubber odor control system as detailed in these Contract Documents.
Posted Date
Oct 28, 2025
Due Date
Dec 3, 2025
Release: Oct 28, 2025
City of O'Fallon
Close: Dec 3, 2025
Demolition of existing dry scrubber odor control system and installation of a new bioscrubber odor control system as detailed in these Contract Documents.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis