Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Enhance streetscape and upgrade utilities along Kansas Street Southwest from Calistoga Street West to Harman Way South/SR-162. Roadway and utility improvements include: A two-lane roadway, one travel lane in each direction; installation of curbs, gutters, sidewalks, and landscaping; utility adjustments and upgrades; enhanced illumination and traffic channelization; signage installation; and curb bulbs at intersections to support traffic calming includes 2,820 LF removing storm pipe, 2,269 LF polypropylene storm sewer pipe 12" diam. incl. trench, 4,410 LF testing storm sewer pipe, 166 LF cured-in-place pipe 18" diam., 82 LF PVC sanitary sewer pipe 6" diam., 2,600 LF ductile iron pipe for water main 12" diam.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Jan 2, 2026
Close: Jan 22, 2026
Roadway improvements to street.
AvailableStorm sewer and roadway improvements.
Posted Date
Dec 22, 2025
Due Date
Jan 15, 2026
Release: Dec 22, 2025
Close: Jan 15, 2026
Storm sewer and roadway improvements.
AvailableWork shall consist of the road rehabilitation and construction of pedestrian facilities. Additional work will include selective demolition within the roadway and along adjacent sidewalks, protection and modifications to existing manhole and utility structures, installation of new curbs, gutters, sidewalks, ADA curb ramps, and installation of new traffic striping and signage. See attached file for full scope.
Posted Date
Dec 15, 2025
Due Date
Jan 14, 2026
Release: Dec 15, 2025
Close: Jan 14, 2026
Work shall consist of the road rehabilitation and construction of pedestrian facilities. Additional work will include selective demolition within the roadway and along adjacent sidewalks, protection and modifications to existing manhole and utility structures, installation of new curbs, gutters, sidewalks, ADA curb ramps, and installation of new traffic striping and signage. See attached file for full scope.
Release: Dec 11, 2025
Close: Feb 11, 2026
Work includes roadway improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis