Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work shall consist of the road rehabilitation and construction of pedestrian facilities. Additional work will include selective demolition within the roadway and along adjacent sidewalks, protection and modifications to existing manhole and utility structures, installation of new curbs, gutters, sidewalks, ADA curb ramps, and installation of new traffic striping and signage. See attached file for full scope.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Jan 2, 2026
Close: Jan 22, 2026
Roadway improvements to street.
AvailableStorm sewer and roadway improvements.
Posted Date
Dec 22, 2025
Due Date
Jan 15, 2026
Release: Dec 22, 2025
Close: Jan 15, 2026
Storm sewer and roadway improvements.
AvailableIncludes, but is not limited to the following: asphalt and concrete pavement removals, earthwork, storm-water improvements, curb and gutter, ADA sidewalk, asphalt paving, pavement marking, signing, water main replacement, traffic control, erosion control and other incidental items and work.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
Includes, but is not limited to the following: asphalt and concrete pavement removals, earthwork, storm-water improvements, curb and gutter, ADA sidewalk, asphalt paving, pavement marking, signing, water main replacement, traffic control, erosion control and other incidental items and work.
AvailableMill and Relay 4” Asphalt Payment – 5,100 SY Removing Reinforced Concrete Panels – 87 EA Concrete Curb and Gutter – 24" – 1,650 LF Reinforced Concrete Panel – 9’-11” x 2’ x 4.5” – 87 EACH HMA Pavement 3 LT 58-28 S and 4 LT 58-28 S– 870 TON HMA Pavement 4 LT 58-28 S – 580 TON HMA Sidewalk 5 LT 58-28 S (Single Layer) – 180 TON 3/4, 1 1/4, 3" Base Aggregate Dense, and Base Aggregate Open Graded – 6,850 TON Geotextile, Type DF Schedule A – 11,600 SY Geogrid Reinforcement, Type SR (Undistributed) – 3,900 SY EPDM Liner (45 Mil) – 450 SY Excavation Common – 2,950 CY Undercutting, EBS of Soft/Yielding Areas (Undistributed) – 1,100 CY Landscaping Restoration – 800 SY Traffic Control – 1 LS Temporary Portable Traffic Control Signals – Undistributed – 2 EA Concrete Barrier Temporary Precast – Undistributed – 1,300 LF – Drainage improvements Inlet Protection Type B, C, and Ditch Checks – 28 EA Remove and Replace Adjusting Rings, Tuckpoint – 8 EA Inlets 4-ft Diameter with R-3067-R Frame and Grate – 6 EA Pipe Underdrain Installation 6-Inch – 3,050 LF Riprap Extra-Light – 250 TON Geotextile Fabric Type SAS – 360 SY Ditch Regrading – 400 LF Landscaping Restoration – 740 SY
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 29, 2026
Mill and Relay 4” Asphalt Payment – 5,100 SY Removing Reinforced Concrete Panels – 87 EA Concrete Curb and Gutter – 24" – 1,650 LF Reinforced Concrete Panel – 9’-11” x 2’ x 4.5” – 87 EACH HMA Pavement 3 LT 58-28 S and 4 LT 58-28 S– 870 TON HMA Pavement 4 LT 58-28 S – 580 TON HMA Sidewalk 5 LT 58-28 S (Single Layer) – 180 TON 3/4, 1 1/4, 3" Base Aggregate Dense, and Base Aggregate Open Graded – 6,850 TON Geotextile, Type DF Schedule A – 11,600 SY Geogrid Reinforcement, Type SR (Undistributed) – 3,900 SY EPDM Liner (45 Mil) – 450 SY Excavation Common – 2,950 CY Undercutting, EBS of Soft/Yielding Areas (Undistributed) – 1,100 CY Landscaping Restoration – 800 SY Traffic Control – 1 LS Temporary Portable Traffic Control Signals – Undistributed – 2 EA Concrete Barrier Temporary Precast – Undistributed – 1,300 LF – Drainage improvements Inlet Protection Type B, C, and Ditch Checks – 28 EA Remove and Replace Adjusting Rings, Tuckpoint – 8 EA Inlets 4-ft Diameter with R-3067-R Frame and Grate – 6 EA Pipe Underdrain Installation 6-Inch – 3,050 LF Riprap Extra-Light – 250 TON Geotextile Fabric Type SAS – 360 SY Ditch Regrading – 400 LF Landscaping Restoration – 740 SY
Available