Iroquois-Kankakee Regional Office of Education (I-KAN)
School DistrictIL
Aug 19, 2026
Closes
Sep 11, 2026
Interior Remodel, City of Kankakee RFP
Bid packages are as follows: 1. General trades 2. Mechanical 3. Electrical 4. Fire suppression system.
Description: Work includes : upgrade and tuckpoint building exterior.
StateAgency · IL, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
Iroquois-Kankakee Regional Office of Education (I-KAN)
School DistrictIL
Aug 19, 2026
Closes
Sep 11, 2026
Bid packages are as follows: 1. General trades 2. Mechanical 3. Electrical 4. Fire suppression system.
OtherIL
Jul 15, 2026
Closes
Aug 26, 2026
Kankakee LSLR Pilot Project will target replacements of lead service lines within multiple areas of the City, as well as surrounding communities of Grant Park, Manteno, Bradley, Bourbonnais, Limestone, and Aroma Park. For the purposes of this project, a galvanized iron service line that is or was previously downstream of a lead source is defined as a lead service line and should be removed and treated as if it was a lead pipe. Addresses may be added to and removed from the list by the Owner or Engineer within the defined Work Area throughout the project duration for a total of approximately 450 service line replacements. Most service line replacements are expected to be full replacements (i.e., both public side and private side are replaced). However, some replacements may be on the public side only, and some may be on the private side only. Contractor may perform replacements at addresses not listed only under the approval of the Owner and/or Engineer. Contractor responsible for preconstruction (scheduling with Customer and completing preconstruction meeting, completing Property Owner Agreement form, developing preconstruction sketch), construction (scheduling replacement with Customer, installation of new copper service line, installation of associated plumbing, meter, and meter vaults), and restoration (road, parkway, sidewalk, front yard, and interior) activities.
FederalLA
Aug 21, 2026
Closes
Sep 3, 2026
Security fence replacement. The new fencing will be approx. 450 LF total, 8' tall, and include barbed wire at the top. Work includes disposal of existing fencing and construction debris, coordination of staging and laydown areas, site safety controls, utility verification, cleanup, required submittals, and closeout documentation.
CityLA
Jun 3, 2026
Closes
Aug 25, 2026
This renovation project consists of interior and exterior renovations. Interior renovation includes new handicap restrooms, new HVAC and fire sprinkler systems, and new interior finishes. Exterior renovation includes new handicap ramp, new asphalt shingle roof and new exterior finishes.
Procurement and program contacts connected to Illinois Capital Development Board.