Summary
Kankakee LSLR Pilot Project will target replacements of lead service lines within multiple areas of the City, as well as surrounding communities of Grant Park, Manteno, Bradley, Bourbonnais, Limestone, and Aroma Park. For the purposes of this project, a galvanized iron service line that is or was previously downstream of a lead source is defined as a lead service line and should be removed and treated as if it was a lead pipe. Addresses may be added to and removed from the list by the Owner or Engineer within the defined Work Area throughout the project duration for a total of approximately 450 service line replacements. Most service line replacements are expected to be full replacements (i.e., both public side and private side are replaced). However, some replacements may be on the public side only, and some may be on the private side only. Contractor may perform replacements at addresses not listed only under the approval of the Owner and/or Engineer. Contractor responsible for preconstruction (scheduling with Customer and completing preconstruction meeting, completing Property Owner Agreement form, developing preconstruction sketch), construction (scheduling replacement with Customer, installation of new copper service line, installation of associated plumbing, meter, and meter vaults), and restoration (road, parkway, sidewalk, front yard, and interior) activities.