Posted
Oct 22, 2026
Dec 3, 2026
Description: Construct a new decorative metal security fence encompassing the perimeter of the existing 42 space parking lot. Work includes the delegated design and deferred submittals for the fence system, gate system, and their respective foundations; furnishing and installing new decorative metal security fencing around perimeter of parking lot, two new automated vehicular gates, four new automated pedestrian gates and electrical low-voltage infrastructure work for access control and communication systems at all new gates; demolition and removal of existing AC, concrete curbs and sidewalks; the salvage and relocation of identified existing elements within the site area; patch and repair of elements to match adjacent conditions, as needed; and the restoration of all curbs, sidewalk and asphalt pavement impacted by fence construction.
StateAgency · OR, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Oregon Department of Administrative Services.
Adjacent opportunities open for bidding right now.
Posted
Oct 22, 2026
Dec 3, 2026
VIP parking lot.
Special DistrictIL
Posted
Oct 21, 2026
Nov 4, 2026
HVAC Upgrades.
Special DistrictWA
Posted
Oct 6, 2026
Nov 5, 2026
Implementation of temporary site controls, traffic/pedestrian controls, marine environmental/water quality controls, and temporary erosion and sediment controls; miscellaneous upland demolition and disposal; site excavation and backfill; installation of electrification systems both upland and in-water; asphalt and concrete surface placements; and other site restorations.
Emerald Coast Utilities Authority
Special DistrictFL
Posted
Sep 3, 2026
Oct 27, 2026
Furnish all labor, materials, equipment, and incidentals required to access the site to perform the demolition activities, constructing the new electrical building, and required upgrades including installation of new owner furnished switch gear and VFD’s to the existing facilities in accordance with the contract plans. Contractor will also need to coordinate with the other Contractor working on site to build a new tank and bypass piping. Major items consist of mobilization/demobilization, permitting, demolition, civil/site work, structures, mechanical HVAC, and electrical & instrumentation.