FederalDC
Jun 9, 2026
Closes
Aug 17, 2026
Juniper Springs Boardwalk - (RFQ)
The project consists of the removal of one (1) existing boardwalk system and construction of one (1) new boardwalk system within the ocala national forest. The new boardwalk system will utilize a modular system with post-on-pin foundations. Specialty structures such as overlooks, the kayak launch, and the pedestrian truss bridge are also included in the project.