Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
City of Augusta, GA requests sealed bids for the Jones Alley Improvements Project (construction/streetscape improvements). Bids must be mailed or hand-delivered (no email); plans/specs obtained from Augusta Blueprint for a $125 fee. Mandatory pre-bid conference with optional site visit. Bonding required: 5% bid bond with submission, and 100% performance and 100% payment bonds upon award. Georgia E-Verify compliance required. Questions/clarifications must be submitted in writing to the Augusta Procurement Department.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Augusta, Georgia is soliciting sealed bids for construction of the Jones Alley Improvements Project. The work involves creating a new roadway and pedestrian corridor between 9th Street and the Augusta Common to improve connectivity and aesthetics in the downtown area. Bids are due January 21, 2026 at 3:00 p.m. EST, with plans/specifications available via Augusta Blueprint and addenda posted to the plan room.
Posted Date
Dec 4, 2025
Due Date
Jan 21, 2026
Release: Dec 4, 2025
Close: Jan 21, 2026
Augusta, Georgia is soliciting sealed bids for construction of the Jones Alley Improvements Project. The work involves creating a new roadway and pedestrian corridor between 9th Street and the Augusta Common to improve connectivity and aesthetics in the downtown area. Bids are due January 21, 2026 at 3:00 p.m. EST, with plans/specifications available via Augusta Blueprint and addenda posted to the plan room.
AvailableThis is a streetscape project in the Pratt Neighborhood. The construction consists of roadway, alley, and subdivision improvements, and includes sidewalks, curbs and gutters, ADA ramps, striping, as well as new water service, new sanitary sewer service, new underground electric service and storm water infrastructure. The primary items of work are approximately: Asphalt Binder (630 Ton), Asphalt Seal (320 Ton), Prime Coat (1900 Gal), Heavy Duty Concrete Paving (2500 CY), 4" Concrete Sidewalks (1200 SY), 18" Concrete Curb and Gutter (2750 LF), 4" Ductile Iron Pipe (750 LF), and 8" Ductile Iron Pipe (1365 LF).
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
This is a streetscape project in the Pratt Neighborhood. The construction consists of roadway, alley, and subdivision improvements, and includes sidewalks, curbs and gutters, ADA ramps, striping, as well as new water service, new sanitary sewer service, new underground electric service and storm water infrastructure. The primary items of work are approximately: Asphalt Binder (630 Ton), Asphalt Seal (320 Ton), Prime Coat (1900 Gal), Heavy Duty Concrete Paving (2500 CY), 4" Concrete Sidewalks (1200 SY), 18" Concrete Curb and Gutter (2750 LF), 4" Ductile Iron Pipe (750 LF), and 8" Ductile Iron Pipe (1365 LF).
This project involves ±0.20 miles of alley improvements. Improvements include clearing & grubbing, grinding existing AC pavement and replacing with new 2" AC section, installation of concrete drive approaches, AC speed humps & traffic striping and signage.
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
This project involves ±0.20 miles of alley improvements. Improvements include clearing & grubbing, grinding existing AC pavement and replacing with new 2" AC section, installation of concrete drive approaches, AC speed humps & traffic striping and signage.
AvailableConstruction services for the Augusta Reservoir Dam Improvement Project (Utilities Department). Procurement requires sealed bids (no email), bid documents obtained exclusively from Augusta Blueprint (non-refundable $100 fee), mandatory pre-bid conference and mandatory site visit, 5% bid bond on submission, 100% performance and payment bonds on award, Georgia E-Verify compliance for contractors/subcontractors, bids non-withdrawable for 90 days, and in-person bid opening with a Teams viewing option.
Posted Date
Dec 4, 2025
Due Date
Jan 20, 2026
Release: Dec 4, 2025
Close: Jan 20, 2026
Construction services for the Augusta Reservoir Dam Improvement Project (Utilities Department). Procurement requires sealed bids (no email), bid documents obtained exclusively from Augusta Blueprint (non-refundable $100 fee), mandatory pre-bid conference and mandatory site visit, 5% bid bond on submission, 100% performance and payment bonds on award, Georgia E-Verify compliance for contractors/subcontractors, bids non-withdrawable for 90 days, and in-person bid opening with a Teams viewing option.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis