Retrieving RFP details
Release
Close
City of Southaven
Work will include complete removal and disposal of the existing culvert structure, installation of a new reinforced concrete box culvert, roadway reconstruction, erosion control measures, and all incidental work required to restore the site to its original or improved condition.
Johns Creek Box Culvert Replacement
Indiana Department of Administration
Potato creek state park culvert replacement project and not exceed 9mb.
County of Kern
Work consist of installing prefabricated box culvert, headwall, wingwall, apron, and rock slope protection, removing existing culvert and asphalt concrete pavement, placing hot mix asphalt dike, paving hot mix asphalt, grading channel, and painting thermoplastic traffic stripes.
Town of Shrewsbury
Replacement of existing 6 FT culvert with a new precast box culvert and wingwalls along the Cold Brook on Northam Road in Town of Shrewsbury, Vermont. Specifically, the work will include mobilization, traffic control, sediment and erosion control, excavation, control of water, removal of the existing culvert, installation of new precast culvert & wingwalls, full depth roadway reconstruction, asphalt paving, pavement markings, guardrail, restoration and related roadway and channel work in accordance with the contract plans and specifications.
Release
Oct 16, 2025
Close
Nov 19, 2025