Norwalk-La Mirada Unified School District
School DistrictCA
Jul 21, 2026
Closes
Aug 19, 2026
John Glenn Hs Freezer Build & Cooler Reline
Work inlcudes installation of a pre-fabricated modular walk-in freezer in an existing storage room including installation of new refrigeration system, electrical work, interior lighting, roof work, and shelving, demolition of an existing walk-in cooler/freezer and reline into a new walk-in cooler including the installation of a new door assembly, refrigeration system, electrical work, and shelving.