CountyMS
Posted
Sep 28, 2026
Nov 17, 2026
All In One Fully Contained SCBA Breathing Air Cascade Fill Station (Reverse Auction) RFP
All components of the Cascade System must be fully housed inside a single NEMA 4 rated electrical enclosure, 6000psi 13.0scfm compressor, four stage, single phase, 10hp or greater, minimum three (3) total containment fill station, 4 DOT cylinders, integrated rack equipped for cylinders, full gauge panel including a pressure gauge for each stage of compression and oil pressure, air directional valve for storage bypass, accommodates SCBA/SCUBA up to 31” overall length with set to fill 4500psi, remote fill hose connection with adjustable regulator for up to 6000psi service, pressure gauge and isolation valve, and an electronic carbon monoxide monitor that meets NFPA standards 1901. Cost shall include freight, basic installation, testing, and hands-on instructions.
