Lakewood Safe Routes to School RFP
Work includes 1 LS erosion control; 1 LS demolition; 110 LF 12" RCP storm drain; 45 LF 12" pvc storm drain; 5 EA storm drain inlets; 3 EA storm drain catch basin; 25 LF standard vertical curb (detail 33 type i); 266 LF standard vertical curb & gutter (detail 33 type ii); 350 LF bioretention concrete work (detail 29); 1,225 SF roadway excavation and 6" hma deep lift; 12 EA curb ramp; 5,190 SF concrete sidewalk; 4 EA storm drain manhole; 2 EA water meter box; 1 EA new fire hydrant assembly; 1 EA replace 6" valves box; 17,180 SF 2" mill grind and ac pavement; 4 EA adjust manhole to grade. See outside link.