Removal of existing resilient floor tile and installation of a commercial decorative epoxy flake floor system in the Rink Concourse and the Allan Andrews and Al Stewart Meeting Rooms at the Bell Aliant Centre, totaling approximately 4,400 square feet. The work scope includes tile removal and legal disposal, substrate preparation (diamond grind or shot blast to required CSP), moisture testing (ASTM F2170 or F1869), crack/pit repairs, installation of a multi-coat 100% solids epoxy with vinyl flake broadcast and a UV-stable aliphatic polyurethane or polyaspartic topcoat with slip-resistant aggregate, and provision of sample flake board, warranty and maintenance instructions. Bidders must supply all labour, materials, equipment and supervision, price optional wall base alternatives separately, meet insurance and WCB requirements, schedule work for spring 2027 during regular business hours, and accept contract terms including a $100/day late completion penalty and holdback/payment provisions.