FederalVA
Posted
Nov 18, 2026
Nov 26, 2026
DSCR Building 70 Roof Replacement - (Request for Quotation)
Building 70 Roof Replacement Remove the existing membrane and all other roofing materials down to the plywood of the existing infrastructure Replace any rafters that were damaged with new lumbers. Lumber must be the same dimensions as existing. All lumber must be hung with galvanized hangers screws, staples, etc. Replace any plywood that was removed with new sheets. Plywood must be mounted on a joint to ensure structural integrity utilizing galvanized fasteners i.e. screws, nails staples, etc. Reinstall/ replace any moisture control components in its appropriate location.
