DG01 - NextGEN Infrastructure Upgrades RFP
Aug 5, 2026
Closes
Aug 24, 2026
12 EA of Install electrical conduit (¾" conduit runs, per SOW Section 3.2.1), 10 locations, including pull string; 12 EA of Install 4 11/16" gang boxes at WiFi access point locations, connected to conduit installed; 12 EA of Install Category 6A cable at the 10 identified locations, including access cable at each end as needed, and perform cable termination ("punch down") in the Telecommunications Room (TR). See attached file.