Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
241-Network Contract Office 01 (36C241)
After award, but prior to the start of any field work, the contractor shall contact the Project Engineer/Manager (i.e. COR) to review proposed methods and plans for completion of work and to review infection control procedures, interim life safety procedures, and hot permits, schedule and shutdown requirements. Please review all documents prior to this meeting. The contractor is responsible for shutting down, making safe, LOTO, and testing all energized parts IAW NFPA 70E. Some off-hours may be required. A. The scope of this work is to furnish and install all new porcelain insulators and new stainless-steel hardware within switch 1 (SW1). B. Furnish and install one new S&C fuse holder assembly. C. Clean and lubricate all mechanisms within the switch (2 sets of 3) IAW NFPA 70B and the manufacturers recommended service. D. Field test insulation resistance and contact resistance within the switch IAW NFPA 70B and the manufacturers recommended service. E. All work plans and material must be submitted to the COR for approval 21 calendar days in advance of planned installation. F. The COR shall be notified of all on-site work 7 calendar days in advance.
Posted Date
Apr 21, 2026
Due Date
May 1, 2026
Release: Apr 21, 2026
241-Network Contract Office 01 (36C241)
Close: May 1, 2026
After award, but prior to the start of any field work, the contractor shall contact the Project Engineer/Manager (i.e. COR) to review proposed methods and plans for completion of work and to review infection control procedures, interim life safety procedures, and hot permits, schedule and shutdown requirements. Please review all documents prior to this meeting. The contractor is responsible for shutting down, making safe, LOTO, and testing all energized parts IAW NFPA 70E. Some off-hours may be required. A. The scope of this work is to furnish and install all new porcelain insulators and new stainless-steel hardware within switch 1 (SW1). B. Furnish and install one new S&C fuse holder assembly. C. Clean and lubricate all mechanisms within the switch (2 sets of 3) IAW NFPA 70B and the manufacturers recommended service. D. Field test insulation resistance and contact resistance within the switch IAW NFPA 70B and the manufacturers recommended service. E. All work plans and material must be submitted to the COR for approval 21 calendar days in advance of planned installation. F. The COR shall be notified of all on-site work 7 calendar days in advance.
Available241-Network Contract Office 01 (36C241)
Contractor to provide Radiopharmaceutical products: UltraTag Vial; Potassium Iodide Tablet (Iosat); Macro Aggregated Albumin Vial; Medronate Vial; Pentetate Vial; Pyrophosphate Vial; Ga-67 Gallium Citrate UD; I-123 Ioflupane UD; I-123 Ioflupane Vial; I-123 Iobenguane Sulfate UD; I-123 USP NaI 100 uCi Cap. See attached file.
Posted Date
Apr 20, 2026
Due Date
Apr 28, 2026
Release: Apr 20, 2026
241-Network Contract Office 01 (36C241)
Close: Apr 28, 2026
Contractor to provide Radiopharmaceutical products: UltraTag Vial; Potassium Iodide Tablet (Iosat); Macro Aggregated Albumin Vial; Medronate Vial; Pentetate Vial; Pyrophosphate Vial; Ga-67 Gallium Citrate UD; I-123 Ioflupane UD; I-123 Ioflupane Vial; I-123 Iobenguane Sulfate UD; I-123 USP NaI 100 uCi Cap. See attached file.
Available241-Network Contract Office 01 (36C241)
1 EA of EEG/Sleep Acq Desktop with IP PTZ 1080p HD Color/SW Camera on ErgoJust Cart; Part number: PK1204HD. 1 EA of Medical Grade UPS with Isolation - 110V EraoJust Cart; Part Number: UPS-NA-EJ. 1 EA of Upgrade NeuroWorks 10.x Acquisition Software with Spike/ Event and High Res Video; Part Number: LC101-U10. See attached file.
Posted Date
Apr 20, 2026
Due Date
Apr 27, 2026
Release: Apr 20, 2026
241-Network Contract Office 01 (36C241)
Close: Apr 27, 2026
1 EA of EEG/Sleep Acq Desktop with IP PTZ 1080p HD Color/SW Camera on ErgoJust Cart; Part number: PK1204HD. 1 EA of Medical Grade UPS with Isolation - 110V EraoJust Cart; Part Number: UPS-NA-EJ. 1 EA of Upgrade NeuroWorks 10.x Acquisition Software with Spike/ Event and High Res Video; Part Number: LC101-U10. See attached file.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
241-Network Contract Office 01 (36C241)
MSPV BPA
Effective Date
Mar 15, 2025
Expires
Effective: Mar 15, 2025
241-Network Contract Office 01 (36C241)
Expires:
MSPV BPA
Available241-Network Contract Office 01 (36C241)
MSPV BPA
Effective Date
Mar 15, 2025
Expires
Effective: Mar 15, 2025
241-Network Contract Office 01 (36C241)
Expires:
MSPV BPA
Available241-Network Contract Office 01 (36C241)
REPAIR & REPOINT TWO BLDGS. MAIN BUILDING & WAREHOUSE (10,800SQFT & 4,400SQFT SURFACE AREA). INCLUDES PREPARATION, STAGING, SEALING, REPLACING BROKEN BRICKS, REPOINTING BRICKWORK, REMOVE/RESET GUTTERS, TENDING TO JOINT MORTAR AND TUCK FLASHING.
Effective Date
Dec 20, 2024
Expires
Effective: Dec 20, 2024
241-Network Contract Office 01 (36C241)
Expires:
REPAIR & REPOINT TWO BLDGS. MAIN BUILDING & WAREHOUSE (10,800SQFT & 4,400SQFT SURFACE AREA). INCLUDES PREPARATION, STAGING, SEALING, REPLACING BROKEN BRICKS, REPOINTING BRICKWORK, REMOVE/RESET GUTTERS, TENDING TO JOINT MORTAR AND TUCK FLASHING.
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Track 241-Network Contract Office 01 (36C241)'s board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Director of Contracting, Network Contracting Office (NCO) 1
Premium
Access the largest public sector contact database