CityCT
Posted
Nov 6, 2026
Dec 10, 2026
Bridge Street Multi-modal Corridor Improvements RFP
Provide bridge street multi-modal corridor improvements.
Description: Work includes clearing and grubbing, removal of structures and obstructions, 100 LF removal of existing markings, 5622 SY removal of concrete walks and drives, 560 LF removal of curbs (concrete), 1 EA relocation of sign (u-channel street sign), 40 cy borrow (vehicular measurement), 40 CY borrow (vehicular measurement) (select soils), 100 EA temporary hay bales, 240 LF temporary silt fencing. See outside link.
StateAgency · LA, US
Decision makers connected to this RFP from Louisiana Department of Transportation and Development.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityCT
Posted
Nov 6, 2026
Dec 10, 2026
Provide bridge street multi-modal corridor improvements.
CityPA
Posted
Nov 18, 2026
Dec 18, 2026
Furnish and install various streetscape improvements including sidewalks, curbs, ADA ramps, and driveways, etc.
CityWA
Posted
Nov 4, 2026
Dec 2, 2026
Work includes approx 1,120 LF of saw cutting existing pavement; 550 LF of cement concrete curb & gutter; 350 LF of cement concrete pedestrian curb; 3,650 LF of removing paint line; 260 LF of removing plastic line; 710 SF of removing plastic crosswalk line; 6,180 LF of plastic line; 930 LF of plastic wide lane line; 250 LF of plastic stop line.1,840 SF of plastic crosswalk line; 220 LF of saw cutting existing pavement.
Posted
Nov 11, 2026
Nov 26, 2026
Upgrade LED lighting in the Colorado Convention Center’s Interior Stout Street Corridor.