CityTX
Posted
Jul 29, 2026
Nov 19, 2026
Athletic Field Improvements at Rockwood, Rolling Hills, Northwest Community and Gateway Parks *Re-bid*
The work in this project includes installation of remote equipment controllers at gateway park, rehabilitation of softball infields, construction of bleacher shading structures and alternate lighting installation and grassing replacement. Also includes 50 SY of remove and replace block sod turf grass; 1,490 SY of 3" depth of remove existing infield mix 3" depth; 1,685 SY of install pro play classic infield clay mix 3" depth.
