University Of Nevada Las Vegas
Higher EducationNV
Posted
Aug 27, 2026
Oct 1, 2026
UNR - Construct Drainage Diversion at West Side Exterior Stairway of University Foundation Arts Building
Construct drainage diversion.
Description: The University of Nevada, Reno is soliciting bids under ITB 9128 for a prevailing-wage drainage diversion at the west-side exterior stairway of the University Foundation Arts Building, with an estimated cost of $50,500 to $150,500. The work includes construction of the drainage diversion and may require a forklift, scissor lift, or crane; awarded work requires specified commercial general liability, automobile, workers’ compensation, pollution, builders risk, and potentially riggers liability insurance. A mandatory pre-bid job walk is scheduled for September 10, 2026, and electronically submitted bids are due October 1, 2026 at 2:00 p.m. Pacific Time.
HigherEducation · NV, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
University Of Nevada Las Vegas
Higher EducationNV
Posted
Aug 27, 2026
Oct 1, 2026
Construct drainage diversion.
CityNC
Posted
Aug 14, 2026
Sep 4, 2026
The Town of Seven Devils is accepting sealed bids from North Carolina licensed general contractors to construct a new Municipal Salt Storage Building at 185 Chinkapin Ridge Road in Seven Devils, NC. Project #264007 includes an approximately 80' × 30' storage building, a 30' × 30' concrete loading pad, site preparation, permits, labor, materials, equipment, and related work. Two signed hard copies are due September 4, 2026, at 12:00 PM, and the posting describes a construction invitation to bid rather than a grant program.
Illinois Capital Development Board
State AgencyIL
Posted
Aug 25, 2026
Oct 6, 2026
Traffic Equipment Building Existing (D0906), New (IDOT 572-0002): Demolish the existing structure down to the existing slab to remain. Construct approximately 4,635 square foot, single-story post framed building over the existing concrete slab. The new posts will be set in a new grade beam around the perimeter of the existing slab. Install metal wall panels and concealed fastener roof system. Install insulation in the exterior walls and install wall panel up to the bottom of the trusses. Install insulation in the attic. Install new overhead doors and man doors. Reinstall the existing air compressor and gas fired heating system. Install new lighting, wiring, receptacles, and panel. Modify sanitary piping and install oil separator. Site work includes replacement of asphalt apron with concrete.
Illinois Capital Development Board
State AgencyIL
Posted
-
Sep 23, 2026
Construct new science building.
Decision makers connected to this RFP from University Of Nevada Reno.