CityVA
Posted
Jun 30, 2026
Sep 14, 2026
Resurfacing Program FY27 - *REBID*
Project consists of 1,637 tn of asphalt, 400 tn of patching, 400 sy of patching, 400 sy of scarification and re-base, 14,876 sy of milling, 10 ea of install manhole rings, 10 ea of install pivoted manhole rings, 2 ea of install prefabricated valve box fixtures, 90 lf of 4" white lines, 240 lf of 4" yellow lines, 180 lf of 8" white cross walk lines, 45 lf of 24" white stop bar lines.