Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Vancouver, Washington invites bids to replace approximately 1,384 feet of ductile iron water main (8-, 6-, and 4-inch) near NE Royal Street and NE 81st Avenue, including associated hydrants, valves, appurtenances, and pavement restoration. Work must conform to the Contract Plans, Contract Provisions, and Standard Specifications and be physically complete within 40 working days from Notice to Proceed. The engineer’s estimate is $360,000 and bids are due January 27, 2026 at 11:00 AM PST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project generally consists of, but is not necessarily limited to, 2305 LF of 8" class 350 dip water main, 116 LF of 6" class 350 dip water main, 160 LF of bored 10-inch dr 11 d. I. P. S. Hdpe water main, 2140 LF of 1" sidr 7 hdpe water service, connections to existing 6" water mains, gate valves, bend, tees, reducers, and other fittings, fire hydrants, subbase, base, and 3" asphalt restoration, and landscape restoration.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Close: Jan 14, 2026
The project generally consists of, but is not necessarily limited to, 2305 LF of 8" class 350 dip water main, 116 LF of 6" class 350 dip water main, 160 LF of bored 10-inch dr 11 d. I. P. S. Hdpe water main, 2140 LF of 1" sidr 7 hdpe water service, connections to existing 6" water mains, gate valves, bend, tees, reducers, and other fittings, fire hydrants, subbase, base, and 3" asphalt restoration, and landscape restoration.
AvailableWater Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableWork consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Close: Feb 4, 2026
Work consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
The City of Keene seeks a qualified engineering firm to perform design and related services for the Court St River Crossing Water Main Replacement Project, which includes replacing approximately 5,000 linear feet of water main and installing a new 12-inch HDPE pipe including an HDD crossing beneath the Ashuelot River. The selected consultant will provide preliminary engineering and design, environmental documentation and permitting, public engagement, and construction administration support.
Posted Date
Aug 7, 2025
Due Date
Aug 7, 2026
Release: Aug 7, 2025
Close: Aug 7, 2026
The City of Keene seeks a qualified engineering firm to perform design and related services for the Court St River Crossing Water Main Replacement Project, which includes replacing approximately 5,000 linear feet of water main and installing a new 12-inch HDPE pipe including an HDD crossing beneath the Ashuelot River. The selected consultant will provide preliminary engineering and design, environmental documentation and permitting, public engagement, and construction administration support.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis