Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide stormwater system repairs at two (2) locations. The work required under this contract includes furnishing materials, qualified labor, equipment, traffic control, erosion control, and site restoration at each location as described in the accompanying construction plans. 1. Conduct all activities as described in accompanying plans, details and exhibits. 2. Seed and straw all disturbed areas. 3. Clean work area.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
On-call contract to construct sanitary sewer laterals, small sanitary sewer system repair projects, and emergency repairs of the sanitary sewer system, and for general repairs, maintenance, and emergency repairs for items that relate to stormwater facilities. Stormwater facilities include all types of systems to transfer or store stormwater; it is not limited to stormwater pipes and/or structures but also roadways and all types of swales, berms and gutters. Work could include replacing / repairing stormwater pipe, catchbasins/inlets, inlet grates, curb pieces, road repairs (such as potholes) or other related small items and emergency repairs.
Posted Date
Jan 10, 2026
Due Date
Feb 6, 2026
Release: Jan 10, 2026
Close: Feb 6, 2026
On-call contract to construct sanitary sewer laterals, small sanitary sewer system repair projects, and emergency repairs of the sanitary sewer system, and for general repairs, maintenance, and emergency repairs for items that relate to stormwater facilities. Stormwater facilities include all types of systems to transfer or store stormwater; it is not limited to stormwater pipes and/or structures but also roadways and all types of swales, berms and gutters. Work could include replacing / repairing stormwater pipe, catchbasins/inlets, inlet grates, curb pieces, road repairs (such as potholes) or other related small items and emergency repairs.
AvailableRepair underground stormwater sewage system.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
Close: Jan 27, 2026
Repair underground stormwater sewage system.
Perform Dockside repairs to the U.S. Coast Guard Cutter (USCGC) HARRIET LANE (WMEC-903), a 270-foot Medium Endurance Cutter.
Posted Date
Jan 13, 2026
Due Date
Jan 27, 2026
Release: Jan 13, 2026
Close: Jan 27, 2026
Perform Dockside repairs to the U.S. Coast Guard Cutter (USCGC) HARRIET LANE (WMEC-903), a 270-foot Medium Endurance Cutter.
Provide a water treatment system for our property aldrich lane fields.
Posted Date
Jan 8, 2026
Due Date
Feb 21, 2026
Release: Jan 8, 2026
Close: Feb 21, 2026
Provide a water treatment system for our property aldrich lane fields.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis